Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Turn Tonight's Orders Into a Bake List and Mixing Sheet Without the Night Manager Adding Up Columns at 9pm?
Problems We Solve

How Do We Turn Tonight's Orders Into a Bake List and Mixing Sheet Without the Night Manager Adding Up Columns at 9pm?

Wholesale bakery bake lists are added up by hand from orders before the night shift. We build a planner that turns orders into bake and mixing sheets.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

In most wholesale bakeries the night's production is worked out by hand after the order cut-off: totals for each product, then trays, then dough weights, then an order for the ovens. We build a planner that takes the confirmed orders at cut-off, totals each product, converts totals into dough batches using your recipes and scaling rules, and prints a bake list and mixing sheet in the order your night team works.

Nine o'clock, calculator out

The last orders came in at eight. Now someone, usually the night manager or the owner, sits with the order book and a calculator. Sixty-two white bloomers, forty sourdough, three hundred rolls split into four types, croissants for eleven cafes. Add the extras for the shop. Work out the dough: how many mixes of white, how many of the sourdough, what that means for flour, water, salt and yeast.

Then write it on the board for the bakers, in the order the ovens should run. If a cafe rings at half nine to add ten baguettes, the sums start again.

Why the bake list stays on paper

Bakery software often handles orders and invoices well but leaves the night's production to the people who know the dough. The step from product totals to mixes depends on your recipes, your mixer sizes, your divider weights and your own habits about scrap dough and overs, and that knowledge is in the night manager's head.

  • Orders are spread across a phone book, emails, texts and standing orders.
  • Product totals are added up by hand for every item.
  • Dough weights are scaled from recipes using a calculator.
  • Mixer capacity decides how many mixes are needed, worked out each night.
  • Oven order is decided from experience and written on a board.

What the late sums cost

Errors, mostly small: a product missed from the total, a mix short by a batch, a cafe's order baked twice. Each one means a short delivery or a pile of spare bread. The planning takes the most experienced person's time at the end of their day, and when they are ill, the night is harder for everyone.

The overnight planner we build

  1. Standing orders, one-off orders and changes all sit in one order record, so at cut-off there is one confirmed list for the night.
  2. The planner totals each product across all customers, plus any shop or spare quantities you set.
  3. Totals are converted into dough using your recipes, including dough weight per piece, scrap allowance and your mixer's maximum batch, giving the number of mixes and the weight of each ingredient per mix.
  4. The bake list is ordered to match how your night runs: which doughs are mixed first, which products share a prove, and the oven sequence your bakers use.
  5. Mixing sheets, bake lists and a tray count per product print or show on a screen in the bakehouse.
  6. Orders added after cut-off are shown as late additions, with the extra mix they need, so the night manager decides whether to take them.
SheetShows
Order totalsEach product, all customers, plus extras
Mixing sheetMixes per dough and ingredient weights
Bake listProducts in oven order, with trays
Late additionsWhat changed after cut-off

Your recipes and your night manager's rules drive the planner. It does the arithmetic, not the baking.

What the night looks like

At cut-off the sheets are ready. The night manager checks them rather than building them, and starts the first mix sooner. Late orders are visible as late orders. The totals and mixes are the same whoever is running the night, and the paper trail of what was baked for whom is there in the morning.

The owner gets something useful as well: a record of what was baked each night against what was ordered, which is the starting point for questions about overs, returns and which products are worth their oven space.

Is this your bakery at nine o'clock?

  • Product totals are added up by hand each night.
  • Dough weights are scaled with a calculator.
  • Only one or two people can build the night's plan.
  • Late orders mean redoing the sums.
  • The bake list lives on a whiteboard.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Can it use our own recipes and scaling rules?

Yes. It is built around your recipes, mixer sizes, piece weights and scrap allowances, which your team can edit.

Does it replace our bakery ordering software?

Not if your ordering works. We can read orders from it and add the production step it lacks.

What if the night manager wants to change the plan?

They can adjust any quantity or order on screen before printing. The planner drafts, the night manager decides.

Will it work on a screen in the bakehouse?

Yes, on a tablet or wall screen, as well as printed sheets for those who prefer paper.

What do we need to provide?

Recipes, mixer sizes, your current order book and a night manager willing to walk us through a shift.

Keep reading

More on Problems We Solve

Start here

Tell us how orders reach your bakery tonight

Describe how orders come in, how the bake list is built and how the vans go out. We will tell you honestly which part is worth building and which is fine as it is. If a change to the tools you already use would do the job, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →