UK-registered +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Keep One Accurate List of Outlets, Tanks and Calorifiers When Buildings Keep Changing?
Problems We Solve

How Do We Keep One Accurate List of Outlets, Tanks and Calorifiers When Buildings Keep Changing?

Water treatment firms work from outlet and tank lists that drift from the building. We build one live register that engineers and assessors both update.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer: TL;DR

Asset registers go stale because they are written once in the risk assessment and never updated when outlets are removed, tanks replaced or wings refurbished. We build a live register per site, fed by engineer visits and completed remedial jobs, with every change recorded and flagged for the assessor, so monitoring, sampling and reports all work from the same current list.

The schematic that stopped matching the building

Every site has an asset list somewhere: in the risk assessment appendix, on a schematic, in a spreadsheet, or in the monitoring template. It lists cold water storage tanks, calorifiers, sentinel outlets, showers, TMVs, little-used outlets, maybe expansion vessels and point-of-use heaters.

Then the building changes. A kitchen is refitted and two sinks are removed. A shower block is added. A calorifier is replaced with a plate heat exchanger. An outlet that was a sentinel is now in a storeroom behind shelving. The engineer notices and scribbles on the monitoring sheet, the risk assessor learns about it at the next review, and the monitoring template still asks for readings from a sink that no longer exists.

One building, four different lists

ListHeld byUpdated when
Risk assessment asset appendixAssessorAt review
Monitoring templateOperationsWhen someone remembers
Sampling planSampling leadWhen a sample point fails
Client's own recordsFacilities managerRarely

Each list was accurate once. Because they are separate, a change reaches one or two of them and not the others, and engineers learn to ignore the parts that are wrong.

Living with a list nobody trusts

Engineers spend visit time working out which outlets on the template are real. Reports carry lines like 'outlet removed' month after month. Sampling plans point to outlets that have moved. Assessors walk into reviews blind to changes your own engineers saw months ago.

Clients notice too. A report that lists assets that do not exist makes the whole document look less careful than it is, and a facilities manager who spots one wrong line starts to doubt the rest.

One live register that every process reads

We replace the separate lists with a single register per site. Monitoring, sampling, TMV servicing and reporting all read from it.

  1. The register holds each asset with its type, location, identifier, photo and the tasks attached to it.
  2. Engineers see the register in their visit form and can mark an asset removed, moved or changed, or add a new one, with a photo.
  3. Changes go into a pending state and are sent to the office or the assessor to confirm, so the register does not change on one person's word.
  4. Completed remedial jobs that install or remove assets update the register automatically once signed off.
  5. Each change is logged with who, when and why, so the history of the building's water system is preserved.
  6. Changes that might affect the risk assessment are flagged to the assessor for their judgement.

If a client has schematics, we attach them to the site and can link assets to the drawing, but the register itself is the working record.

A register engineers stop working around

Monitoring templates are always current, because they are generated from the register. Sampling points refer to assets that exist. Assessors arrive at reviews with a list of changes since the last one, already documented with photos.

The office stops maintaining four lists. Clients see an accurate inventory of their own water system, which many of them have never had.

A typical day shows the difference. An engineer on a school visit finds that the science block sinks have been replaced during the summer. Instead of writing 'new sinks, see note' on a sheet, they update the three assets in the form with photos. The office confirms them the same afternoon, the assessor receives the change flag, and next month's template already shows the new sinks.

Check your registers against this

  • Monitoring sheets list outlets that have been removed.
  • Your asset list lives in several documents that disagree.
  • Assessors find changes at review that engineers saw months earlier.
  • Remedial works change the system without updating any list.
  • Clients have no current inventory of their own water assets.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly. A senior engineer reads every question.

Ask about your project

Who approves changes to the register?

You choose: the office, a supervisor or the assessor. Changes stay pending until approved, and the history records who approved them.

Can we import existing asset lists?

Yes. We import from spreadsheets, templates and risk assessment appendices, and highlight duplicates or conflicts for someone to resolve.

Does the register replace the risk assessment?

No. The assessment remains your assessor's document. The register keeps the working list current and tells the assessor what has changed.

Can clients edit the register?

Clients can report changes they have made, which then go through the same approval as engineer changes.

Keep reading

More on Problems We Solve

Start here

Tell us where your water hygiene admin gets stuck

Describe your contracts, how many sites your engineers cover and the systems you use now for scheduling, reports and invoicing. We will tell you what we would build and what we would leave alone. If your current software can do the job with better set-up, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate, with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →