Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Keep Track of Revision Rounds So Extra Changes Are Agreed and Charged Before We Do Them?
Problems We Solve

How Do We Keep Track of Revision Rounds So Extra Changes Are Agreed and Charged Before We Do Them?

Video production quotes include two revision rounds, and clients get six. We build tracking that counts rounds, flags new requests and gets extras agreed.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Revision rounds overrun because nobody counts them, feedback trickles in outside rounds, and new requests that change the brief look like ordinary notes. We build round tracking tied to the quote, which counts each round, separates amends from new requests, and asks the client to approve extra rounds or changes before the editor starts them.

Round six of two

The quote for an explainer video said two rounds of amends. After round two, the client sends a few more tweaks, which the producer accepts to keep them happy. Then a new stakeholder joins and wants a different voiceover. Then the legal team asks for a new end card. Then marketing decides the video should be two minutes, not three.

By the time the film is signed off, the editor has spent far more days than quoted. The producer knows it but has no clear record of when the rounds ended and what was new. Raising it at the invoice stage feels like an ambush, so the extra time is absorbed.

Why rounds are never counted

  • Nothing marks when one round ends and the next begins.
  • Small extra notes arrive between rounds and are just done.
  • New requests, such as a changed brief, look like normal notes.
  • The producer does not want a difficult conversation mid-job.
  • The quote's terms on revisions are not in front of anyone during the edit.

What uncounted rounds cost

Unbilled edit days come straight off the job's margin, and they happen on the jobs with the most demanding clients. Editors get frustrated working on endless versions. Other jobs slip because suite time was eaten. And clients learn that rounds are unlimited, which makes the next job harder. None of this is the client being unreasonable, usually. They simply never see a count, so they have no idea how many rounds they have had.

How we build round tracking

  1. Each job carries the number of included rounds from the quote, and what counts as a round in your terms.
  2. Each review is opened and closed as a numbered round, linked to a version, so the count is visible to the producer and the client.
  3. Notes are classified as amends or new requests. A language model suggests which notes look like changes to the brief, such as a new voiceover, a different length or a new section, for the producer to confirm.
  4. When the included rounds are used, or new requests appear, the system drafts a short change note for the client: what is requested, what it affects, and the cost or time from your rate card.
  5. The client approves the change note from a link, and the approval is recorded against the job.
  6. At invoice time, approved extra rounds and changes are listed with their approvals, ready to add to the invoice in Xero or QuickBooks.
SituationWhat happens
Round within the quoteCounted and shown to both sides
Round beyond the quoteChange note drafted for client approval
Note that changes the briefFlagged as a new request, change note drafted
Late notes between roundsHeld for the next round, not done ad hoc
Approved changeListed for the invoice with approval date

The explainer, with rounds tracked

Round 1 and round 2 are counted on the review page. The client can see they have used both. When further notes arrive, the producer sends a change note for a third round, which the client approves. The voiceover change is flagged as a new request and costed, and the client decides to keep the existing voice.

The final invoice includes the approved extra round, with the approval attached. There is no ambush and no absorbed cost.

Your editors notice the difference as well. Late notes no longer arrive one at a time in the middle of other work. They wait for the next round, which lets the editor plan suite time properly and finish one job before starting another.

Is this how your edits run?

  • Jobs regularly go beyond the rounds in the quote.
  • Extra rounds are rarely charged.
  • New requests are treated as ordinary notes.
  • Nobody knows which round a job is on.
  • Raising extra costs feels awkward because nothing was agreed at the time.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Will clients be put off by change notes?

Most accept them when they come at the time with a clear reason, rather than at invoice stage. The tone of the note is yours to set.

Can you tell us what to charge for extra rounds?

No. Charges come from your own rate card or quote terms.

Does this need a new review tool?

No. It works with the review flow you use, or with the one we set up.

What drives the cost?

How your quotes are held today, the review tool, and the connection to your invoicing.

Keep reading

More on Problems We Solve

Start here

Tell us how footage and feedback move through your edit

Describe where your footage lives from shoot to archive, how clients send feedback on cuts, and which storage, review and editing tools you already use. We will tell you what we would build and what we would leave alone, and if Frame.io or your storage already does it with a setting you are not using, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →