How Do We Keep Track of Every G98 Notification and G99 Application Without a Spreadsheet?

Solar installers lose track of DNO notifications and G99 applications across dozens of jobs. We build a tracker that links each submission to the install date.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Network operator paperwork gets lost because each job needs a different submission depending on system size and battery, responses arrive by email from several DNOs, and the status lives in one person's spreadsheet. We build a tracker that works out which submission a job needs from your own rules, records what was sent and when, reads DNO replies into the job, and stops an install date being confirmed while an approval your process requires is still outstanding.

The spreadsheet only one person understands

Your office manager keeps a spreadsheet of network operator submissions. Column for the job, column for which DNO, column for whether it is a notification after install or an application before it, column for date sent, and a notes column full of 'chased 14th' and 'they want the single line diagram again'. When she is on holiday, nobody else is quite sure which jobs are waiting on approval.

Then an install team is booked for a job with a large battery, and on the Thursday before, someone realises the application has not come back yet.

Why DNO paperwork is hard to keep on top of

  • Whether a job needs a notification after installation or an application before it depends on the inverter and battery capacity, which can change after the survey.
  • Different network operators have different portals, forms and email addresses.
  • Replies arrive by email, sometimes weeks later, often asking for more information.
  • Export limitation, where approval depends on limiting what the system sends to the grid, adds another detail to track.
  • The status is not visible to the people booking installs.

What is required for each job is set by the network operator's rules and your own technical team. This article is about tracking it, not deciding it.

What a lost application costs

Installs postponed at short notice, with scaffolding already booked and the homeowner already told. Crews reshuffled at the last minute. Notifications that should have gone after installation and were forgotten, which leaves the job file incomplete and can hold up the paperwork your customer needs for their export tariff. And an office manager who cannot take a week off.

A tracker tied to the job

  1. When a job's design is final, the tracker reads the system details from your CRM or design output and applies your rules to suggest which submission is needed, for a person to confirm.
  2. It prepares the submission with the details already known, such as the address, MPAN, equipment and capacities, and the documents your process attaches.
  3. When it is sent, the date, DNO and reference are recorded against the job.
  4. Replies from DNO email addresses are matched to the job by reference or address, and the status is updated: approved, more information needed, approved with conditions such as export limitation.
  5. Requests for more information create a task for the right person, with the DNO's message attached.
  6. Install booking checks the status first. If your process requires approval before installation and it has not arrived, the booking is flagged rather than confirmed.
  7. Post-installation notifications are raised automatically from the commissioning record, so they are not forgotten.

Status board by job

JobSubmissionSentStatusInstall date
Panels only, small systemNotification after installNot yet dueRaised at commissioningBooked
Panels with large batteryApplication before installSentAwaiting replyHeld until approved
Three-phase supplyApplication before installSentMore info requestedHeld
Export-limited systemApplicationApproved with conditionsConditions notedBooked

An illustration of the view, not a statement of which submission any job needs.

What changes in the office

Anyone can see where every submission stands. DNO requests for information are picked up the day they arrive. Installs are not confirmed while an approval is outstanding. Post-install notifications go out as part of commissioning. And the knowledge stops living in one spreadsheet.

Is DNO paperwork a worry?

  • One person holds the status of every DNO submission.
  • Installs have been postponed because approval had not come back.
  • DNO replies sit in an inbox for days.
  • You have found post-install notifications that were never sent.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does this submit to the DNO portals for us?

Where a portal accepts submissions electronically it can prepare them; many still need a person to upload. The tracker records the submission either way.

Does it decide whether we need a G99 application?

No. It suggests based on the rules your technical team sets, and a person confirms. The network operator's requirements are what count.

Can it read DNO emails?

Yes. Replies from known DNO addresses are matched to jobs, and anything it cannot match goes to a person.

Which CRMs does it work with?

Most with an API, including HubSpot and Pipedrive, and many solar-specific systems. We check yours first.

Keep reading

More on Problems We Solve

Start here

Tell us where the admin is slowing your installs

Describe the problem, the CRM or design software you use and who handles it now. We will tell you what we would build, and if a change to your current setup would do the job, we will say that instead.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →