How Do We Plan Porters, Drivers and Lorries for Tomorrow's Moves Without the Whiteboard?

Removals crews and vehicles are planned on a whiteboard that one person understands. We build a planning board that shows jobs, staff, vehicles and clashes.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

In many removals firms, tomorrow's crews are planned on a whiteboard in the yard office by one person who holds the whole picture in their head. We build a planning board that lists the booked moves, the drivers and porters available, and the vehicles, flags clashes and licence mismatches, and sends each crew their job sheet the night before.

Four o'clock, and the board is full of arrows

The planner stands in front of the whiteboard with a marker. Tomorrow there are three house moves, a packing day, an office move that starts at six and a storage delivery. Two porters have rung in about a hospital appointment, one lorry is booked in for its service, and the 7.5 tonne needs a driver with the right licence.

Names are rubbed out and rewritten. Somebody takes a photo of the board and sends it to the crew group chat. At seven the next morning a porter turns up at the wrong job because the photo was taken before the last change.

Why the whiteboard survives

The whiteboard is quick and flexible, which is why it lasts. The trouble is everything it cannot know.

  • It does not know which drivers hold which licence categories.
  • It does not know that a vehicle is off the road for a service or MOT.
  • It cannot warn when a porter is on two jobs, or on a day off.
  • Job details live somewhere else, so crews get a name and an address and little more.
  • Only the planner can read it, so the planner cannot take a holiday.

What planning in marker pen costs

Most of the cost is in the small failures: a crew one person short, a lorry too small for the volume, a driver without the right entitlement for the vehicle, a packing team who did not know the customer wanted the kitchen done first. Each one is sorted on the day, with extra time, extra phone calls and a less happy customer.

There is also a quieter cost in the planner's evenings, and in what happens to the business when they are off sick in the busiest week of the month.

How we build a planning board that knows the rules

  1. Booked moves come in from your removals software or booking records, each with its volume, start time, addresses, access notes and any packing or storage work.
  2. Staff records hold roles, licence categories and availability, including holidays and known appointments.
  3. Vehicles are listed with size and status, so anything off the road for service or repair cannot be allocated.
  4. The planner drags crews and vehicles onto jobs. The board warns about clashes, a vehicle too small for the surveyed volume, or a driver without the right licence for that lorry.
  5. When the plan is fixed, each crew member gets their job sheet by text or app: times, addresses, access notes, the inventory and the customer's contact number.
  6. Late changes send an update only to the people affected, so nobody works from an old photo.
CheckWhat it prevents
Licence categoryA driver allocated to a lorry they cannot drive
Vehicle statusA booked job on a lorry that is in for service
Volume against vehicleArriving with too little space
Double allocationA porter on two jobs at once

The planner still makes every decision. The board just stops the obvious mistakes and gets the result to the crews.

What tomorrow looks like with it

The plan is visible to the office, not just the planner. Crews wake up with the right job sheet on their phones. If someone rings in sick at six, the planner can see who is free and what they are licensed to drive in one screen.

Over time the board also becomes a record of who worked where, which helps with pay queries and customer questions.

Is your planning on a board?

  • Tomorrow's crews are written on a whiteboard or a paper diary.
  • Crews get their jobs from a photo or a group chat.
  • Licence and vehicle checks rely on the planner's memory.
  • Crews arrive without the inventory or the access notes.
  • Nobody else can plan if the planner is away.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Can the planner still move things around quickly?

Yes. Drag and drop is the main way of working, and the checks only warn, they do not block your decisions.

Do crews need a special app?

Not necessarily. Job sheets can go by text with a link, or through a simple app if you want signatures and photos back.

Does it replace our removals software?

Not usually. It reads booked jobs from it where possible and adds the planning layer it lacks.

What drives the cost?

How many depots and crews you plan, how jobs come in from your current system and whether you want crew replies and photos back.

What do you need from us?

A week of plans as they really happened, your staff and vehicle lists and time with the planner.

Keep reading

More on Problems We Solve

Start here

Tell us how your removals diary really works

Describe how moves, crews and vehicles are planned today, what goes wrong in a busy week, and which software or spreadsheets you rely on. We will tell you what we would build and what we would leave alone. If the answer is a change to how you use your current system, we will say that instead.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →