UK-registered +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Price a Manufacturer's Scrap and Waste Tender Properly When It Lands With a Week's Notice?
Problems We Solve

How Do We Price a Manufacturer's Scrap and Waste Tender Properly When It Lands With a Week's Notice?

Recycling firms price factory scrap tenders from memory and old spreadsheets. We build a tender pricing tool from your grades, costs and buyer prices.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer: TL;DR

Tenders from manufacturers are priced in a rush because each one mixes several scrap grades, containers, collection frequencies and rebate structures, and the costs behind a price live in different spreadsheets. We build a tender pricing tool that holds your grade values, buyer prices, haulage and container costs, builds a priced response per stream, and records what you bid so later tenders start from real history.

A tender with seven lots

A manufacturer of kitchen appliances sends out a tender for its scrap and recyclables. Seven lots: steel offcuts, aluminium, copper cable, cardboard, plastic film, wooden pallets and general waste. Each lot lists estimated monthly volumes, current container arrangements and the rebate or charge structure they want: fixed price, index-linked, or a share of the sale price. Responses are due next Friday.

Your sales manager opens a spreadsheet from a tender two years ago and starts adapting it. He needs current buyer prices for each grade, the haulage cost to that site, the container costs, the cost of processing each stream at your yard, and a view on which lots are worth winning. The figures are in several places, some out of date. He works late on Thursday.

He wins two lots, loses five. He is not sure why, and next time he will start from the same old spreadsheet.

Why tenders are priced from scratch

Every tender is different, but the ingredients of a price are the same. They are just never kept in one place.

  • Grade values and buyer prices change and are held in the sales manager's head or emails.
  • Haulage and container costs by site are not recorded for quoting.
  • Processing costs per stream at your yard are rarely known.
  • Past tenders, what you bid and whether you won, are not recorded.
  • Rebate structures, fixed or index-linked, change how risk sits with you.

What rushed tender pricing costs

Pricing too high loses lots you could have served profitably. Pricing too low wins lots that lose money for the life of the contract, and index-linked structures can make that worse when markets move.

Without a record of past bids and outcomes, you cannot learn where you are competitive and where you are not. Each tender is a new guess.

And the time spent assembling figures is time not spent on the part that needs judgement: which lots to go for and how hard.

How we build a tender pricing tool

What we build brings the ingredients of a price together and records every bid.

  1. Your grades are recorded with current buyer prices from your offer log or contracts, updated as they change.
  2. Haulage costs are calculated from the site's location and your haulage rates, by container type and frequency.
  3. Container costs, such as purchase, maintenance and exchanges, are set per container type.
  4. Processing costs per stream at your yard are recorded as your own estimate, and can be refined over time.
  5. For each lot, the tool builds a price or rebate from these, under the structure the tender asks for, and shows your margin. You adjust and decide.
  6. The response is exported in the tender's format, and every bid is recorded with the outcome, so the next tender starts with your own history.
IngredientSource
Grade valueBuyer prices and contracts
HaulageSite location and your rates
ContainersYour container costs
ProcessingYour cost estimate per stream
Past bidsTender history with outcomes

The next tender

A tender arrives with five lots. The sales manager enters the site and the lots. The tool shows current values, haulage for that site, container costs and processing, and builds a draft price for each lot with the margin. He sees that the film lot barely breaks even at the structure requested, and decides not to bid for it.

He also sees the history: at a similar tender last year, you lost the steel lot to a slightly higher rebate. He adjusts. The response is ready on Tuesday, not Thursday night.

Are tenders priced from old spreadsheets?

  • Each tender starts from an old spreadsheet.
  • Buyer prices and costs are gathered from several places each time.
  • You do not know your processing cost per stream.
  • Past bids and outcomes are not recorded.
  • You are not sure why you win some lots and lose others.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly. A senior engineer reads every question.

Ask about your project

Do you set our prices?

No. The tool builds a price from your costs and values. You decide what to bid.

How are processing costs estimated?

From your own figures. We help set up an estimate per stream, which you refine over time.

Can this handle index-linked structures?

Yes. The tool shows the price under the structure requested, using current index values.

Can responses be exported in the tender's format?

Yes, where the tender provides a spreadsheet or form, the tool fills it.

What do you need from us?

A recent tender and your response, your grades and buyer prices, and haulage and container costs.

Keep reading

More on Problems We Solve

Start here

Tell us where tonnes and money go missing between gate and buyer

Describe how material comes in, how it is graded, paid for, stored and sold today, and which systems and spreadsheets hold each part. We will tell you what we would build and what we would leave alone, and if your weighbridge or accounts software can already do it with a setting change, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate, with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →