Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Can Our Practice Handle a Growing Number of Insurance Reinstatement Cost Assessments Without Them Swamping the Team?
Problems We Solve

How Can Our Practice Handle a Growing Number of Insurance Reinstatement Cost Assessments Without Them Swamping the Team?

Quantity surveyors doing reinstatement cost assessments juggle bookings, site data and reports. We build one workflow from instruction to issued report.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Reinstatement cost assessments are small jobs with a lot of admin: quoting, booking access, measuring on site, building the calculation and writing the report. We build a workflow that takes the instruction, books the visit, captures measurements and photos on a tablet, feeds your calculation template and drafts the report, with the surveyor making the assessment.

Lots of small jobs, each with the same admin

Property managers, landlords and blocks of flats need their buildings' reinstatement cost assessed for insurance, and many want it reviewed every few years. Each instruction is a small fee. Each needs a quote, a letter of engagement, access arranged with a managing agent or caretaker, a site visit to measure and photograph, a calculation using your practice's approach and cost data, and a report.

When a portfolio of twenty blocks arrives at once, the admin swamps the surveyors. Access dates get muddled. Measurements are written on paper plans and typed up later. Reports are built by editing the last one.

Why assessments pile up

  • Every job repeats the same quote, engagement and access steps by hand.
  • Access is arranged by phone and email with people who are hard to reach.
  • Site measurements and notes are captured on paper and retyped.
  • The calculation lives in a spreadsheet that each surveyor has tweaked.
  • Reports are edited from the previous one, so old details can slip through.

The cost of the admin

On small fee work, admin decides whether the job is worth doing. Surveyors spend their time on arrangements rather than assessments. Portfolio instructions queue up. Mistakes carried over from the previous report are the kind of error you least want in a document that someone's insurance relies on.

StepManualIn the workflow
Quote and engagementWritten each timeGenerated from the instruction, signed online
AccessPhone and email tagBooking link sent to the site contact
Site capturePaper plans and camera rollTablet form with measurements and photos
CalculationPersonal spreadsheetShared template fed from site data
ReportEdited from the last oneDrafted from this job's data

The workflow we build

  1. Instructions arrive through a web form or by email and are logged, with portfolio instructions split into one job per building.
  2. A quote and engagement letter are generated from your fee table and terms and sent for online signature.
  3. The site contact receives a link to choose a visit slot from the surveyor's available times.
  4. On site, the surveyor records measurements, construction type, specification notes and photos on a tablet form that works without signal.
  5. Site data feeds your practice's calculation template, using the cost data and approach your practice has chosen.
  6. A report is drafted from this job's data only, in your format, for the surveyor to review, edit and sign off.
  7. Issued reports are filed and a review date is set, so the client can be contacted before the next assessment is due.

The assessment itself, including the approach and the figure, is the surveyor's professional work. Insurance cover decisions are for the client and their broker. The workflow handles everything around the assessment.

Assessments without the pile-up

A portfolio instruction becomes a list of jobs, each with its own status. Site contacts book their own visits. The surveyor measures once on site and does not retype. Reports start from the right building's data. Repeat work is prompted automatically, which is useful for a practice that wants the review business.

For a repeat assessment, the previous visit's measurements and photos are loaded onto the tablet, so the surveyor confirms and updates rather than starting again, and can see at a glance what has changed about the building since last time.

Is this your reinstatement work?

  • Every assessment starts with the same quote and letter written by hand.
  • Arranging access takes more time than the visit.
  • Measurements are typed up from paper after the visit.
  • Reports are built by editing the previous one.
  • Nobody prompts clients when their next assessment is due.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does it calculate the reinstatement cost?

It feeds your practice's own calculation template with site data. The surveyor makes the assessment.

Can it use published rebuild cost data?

If your practice subscribes to a data source and its terms allow, the template can use it, as it does today.

Can property managers send a portfolio at once?

Yes. A portfolio is split into individual jobs with their own access and status.

What affects the cost?

The number of job types, the tablet forms needed, and how the calculation and report templates are structured.

Keep reading

More on Problems We Solve

Start here

Tell us where the paperwork slows your surveyors

Describe the documents your surveyors produce, the tools they use and where the time goes. We will tell you what we would build and what we would leave alone, and if a smaller change would fix it, we will say so. Professional judgement stays with your surveyors.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →