How Can Our QS Team Stop Spending Days Pulling Together Every Monthly Interim Valuation?

Quantity surveyors lose days each month assembling interim valuations from site notes and spreadsheets. We build one record fed by site and contract data.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Interim valuations are slow because the inputs sit in separate places: the contract sum analysis, site progress notes, the variations log, materials claims and last month's certificate. We build one valuation record per project that pulls those together, carries forward last month's figures, flags what has changed, and produces the valuation and supporting schedules in your format, with the surveyor making every judgement on value.

Valuation week on five projects at once

It is the last week of the month. You have five live projects, each with a valuation date in the contract. For each one you need the contractor's application, your own view of progress from the site visit, the latest position on variations, any materials on or off site, and last month's certified figures to work out the amount due this time.

The site notes are in a notebook and a phone camera roll. The variations log is a separate spreadsheet, updated whenever someone remembered. Last month's valuation is a workbook you copy and edit, which means rolling the previous figures forward by hand and hoping no formula broke in the process.

The real reason valuations drag

Measuring progress is skilled work and it should take time. What takes the extra time is assembly. Each valuation is built by copying last month's file and patching in new information from four or five sources, none of which talk to each other.

  • Percentage complete per line of the contract sum analysis is entered from handwritten notes.
  • Variations that have been agreed, valued or are still pending sit in a separate log with a different reference system.
  • Materials on site claims arrive as photos and delivery notes by email.
  • Retention and previous certificates are recalculated each time in the spreadsheet.
  • Differences from the contractor's application are explained in an email rather than recorded against each line.

Where the cost shows up

Surveyors spend the most skilled days of the month on copying and reconciling. Arithmetic errors creep in when a row is added and a total does not pick it up. Contractors query figures, and working out why a line moved means opening three versions of the file. When a valuation is disputed later, the evidence for what you saw on the day is scattered or gone.

InputWhere it lives nowIn the valuation record
Contract sum analysisTender workbookLoaded once, lines fixed for the project
Progress on siteNotebook and photosEntered per line on a tablet, photos attached
VariationsSeparate logLinked, with status and valued amount
Materials claimsEmail attachmentsLogged with delivery notes and photos
Previous certificatesLast month's workbookCarried forward automatically

What we build for valuation week

  1. Each project gets a record holding the contract sum analysis or activity schedule, loaded once from your tender workbook.
  2. On site, the surveyor records progress against each line on a tablet or phone, with photos attached to the line they support. It works without signal and syncs later.
  3. The contractor's application is imported from their spreadsheet or read from the PDF, and shown next to your assessment, line by line.
  4. Variations come in from the variations log with their status, so only the ones you have decided to include are counted.
  5. Materials on site claims are logged with their delivery notes and photos.
  6. Previous certified amounts, retention and amounts due are calculated from the record, not typed in.
  7. The valuation, the supporting schedules and a line-by-line comparison with the application export in your practice's format for review and issue.

Nothing is certified by the system. The surveyor decides every percentage, every inclusion and every exclusion. The build removes the retyping and the recalculation, and keeps the evidence attached.

What valuation week looks like after

Site notes go straight into the record while you are standing in the building. Back at the office, the draft valuation already carries last month's figures and this month's application alongside your view. Your time goes on the lines where you and the contractor disagree, and when someone asks why a line was valued at a figure, the photo and note are one click away.

Signs this is you

  • Every valuation starts by copying last month's workbook.
  • Site progress notes are handwritten and typed up later.
  • You have found a total that did not include a newly added row.
  • Explaining differences from the contractor's application means writing long emails.
  • Photos from site visits are not linked to the valuation they supported.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does this work for both JCT and NEC projects?

The record is built around your valuation lines, so it can follow an activity schedule or a contract sum analysis. Which contract terms apply and what they require stays a matter for your surveyors and advisers.

Can contractors submit applications into it?

They can, through a simple upload, or you can keep receiving applications by email and import them. We design around what your contractors will actually do.

What if we are on the contractor's side, not the client's?

The same record works for preparing applications. The fields change slightly, the structure does not.

Do we need to replace our existing software?

Not usually. The output matches your current valuation format, and we connect to whatever you already use where it allows it.

What does the cost depend on?

The number of contract types and formats you need, how much offline site use is required, and which systems the record connects to.

Keep reading

More on Problems We Solve

Start here

Tell us where your QS admin eats the week

Describe the job, the spreadsheets and software your surveyors use, and where the time goes. We will tell you what we would build and what we would leave alone, and if a smaller change would fix it, we will say so. Commercial and contractual judgement stays with your surveyors.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →