How Do We Keep the Client's Cost Plan in Step With Design Changes Before the Contract Is Let?

Quantity surveyors find design changes reach drawings before the cost plan. We build pre-contract change control that logs, prices and gets client sign-off.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Before contract, design changes arrive through revised drawings, meeting notes and emails, and the cost plan only catches up at the next formal stage. We build a change control log that spots design changes as they are issued, asks the QS for a cost effect, routes each change to the client for a decision, and keeps the cost plan's change history alongside.

Design moves faster than the cost plan

The architect has issued a revised floor plan. The structural engineer has changed the frame after ground investigation. The client asked for a larger reception area in a workshop two weeks ago. None of this went through a formal change process, because it is all pre-contract and the design is still developing.

At the next cost check, the total has moved and the client is surprised. They agreed to every change in principle but never saw the cost of each one as it happened.

Why cost trails design

  • Design changes are issued as drawing revisions, with little or no description of what changed.
  • Client requests are made in meetings and recorded in minutes, if at all.
  • The QS is not always on the drawing issue list, or sees revisions in a batch.
  • Pricing a change is squeezed between formal cost checks.
  • There is no step where the client approves the cost of a change before the design team develops it.

What drift in the cost plan costs

Clients lose confidence when the cost plan jumps. Value engineering exercises become fire-fighting late in the design, undoing work that has already been done. Your surveyors are blamed for news they had no chance to give earlier. And the design team does work on changes the client might have rejected had they known the cost.

Source of changeHow it arrivesHow the log catches it
Drawing revisionIssued through the project platformRevision detected, change note requested
Client requestMeeting or emailLogged from minutes or inbox for review
Design team proposalEmail or reportLogged and routed for pricing
Site informationSurvey or investigation reportLogged as a cost risk

The change control log we build

  1. We watch the drawing issue and correspondence channels your project already uses, such as a project platform with an API or a project mailbox.
  2. New revisions and requests are logged as potential changes. For drawings, the designer's revision note is captured and, where it is thin, the designer is asked for a sentence on what changed.
  3. The QS gets each change with a request for a cost effect, and records an estimate, a range or a note that it is neutral.
  4. Changes with a cost effect are sent to the client contact for a decision, with a simple approve, reject or discuss choice.
  5. The cost plan carries the approved changes as a separate list until the next formal update, so the running total is always current.
  6. At each cost check, the log shows every change since the last one, with its decision.

Estimating the cost of a change is the surveyor's work. The log makes sure they see every change early enough to do it, and that the client decides with the cost in front of them.

When changes are visible as they happen

The client sees the cost of each change when it is made, not months later in aggregate. The cost check is a confirmation of known movement. The design team spends less effort on changes the client would not have approved. Your surveyors are the people who warned early, not the ones who delivered the bad news late.

The log is also a useful record at contract award. It shows how the design reached its tender state, which decisions the client made and on what cost information, and which changes were rejected. When questions come up later about why the scheme looks the way it does, the answer is written down.

Does your cost plan trail the design?

  • The cost plan moves at each check and the client asks why.
  • Drawing revisions reach you in batches with little explanation.
  • Client requests in meetings are not priced before they are designed.
  • Value engineering happens late and under pressure.
  • You cannot list every change since the last cost check.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Will the design team have to change how they work?

Very little. They keep issuing drawings as they do now. The log may ask for a short change note where the revision description is thin.

Does the client need a login?

No. Decisions can be made from an email link, and a read-only view can be shared if they want it.

Does the tool price the changes?

No. The surveyor prices them. The tool makes sure each change is seen and decided.

What affects the cost?

The platforms to connect, the number of projects, and how the log feeds your cost plan format.

Keep reading

More on Problems We Solve

Start here

Describe the QS process that keeps catching you out

Tell us how it works today, which spreadsheets and systems are involved and what goes wrong. We will tell you what we would build and what we would not, and if a smaller change would fix it, we will say so. Contractual and commercial calls stay with your surveyors.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →