How Can We Stop Daywork Sheets Arriving Late, Unsigned and Impossible to Verify?

Quantity surveyors receive daywork sheets weeks late, unsigned and hard to check. We build phone-based daywork capture with same-day signing.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Daywork becomes a dispute because sheets are filled in on paper, signed days later if at all, and reach the QS long after anyone can remember the work. We build a phone-based daywork record that captures labour, plant and materials on the day with photos, gets a site signature there and then, links to the instruction, and feeds the valuation.

A stack of sheets at month end

The contractor's application includes a bundle of daywork sheets. Some are signed by a site manager who has since moved to another job. Some are signed by nobody. One claims two operatives and an excavator for a day on work that you thought was covered by a variation already valued. The dates are three weeks old and nobody on site is quite sure what happened.

You can reject what cannot be verified, but that turns into an argument, and the contractor feels they are losing money for work they did.

Why dayworks cause so much friction

  • Sheets are filled in after the event, from memory, often at the end of the week.
  • Signatures are collected late, from whoever is on site, who may not have seen the work.
  • There is no link between the sheet and the instruction that authorised daywork.
  • Hours, plant and materials are described loosely, so pricing them is a negotiation.
  • The QS sees the sheet weeks after the work, with no photos.

Daywork is a legitimate way of valuing some work. The friction comes from the paper process around it, not from the principle.

What the paper process costs

Disputed dayworks slow valuations and the final account. Some genuine work goes unpaid. Some work already paid another way gets claimed twice. Site managers are asked to sign things they cannot verify, and the relationship between site and commercial teams gets strained.

Question you need answeredPaper sheetDigital record
Was daywork instructed?Often unclearLinked to the instruction
Who worked, for how long?Written laterRecorded on the day with names
What plant and materials?Loosely describedChosen from the job's list, with quantities
Who confirmed it?Late or missing signatureSigned on the phone the same day
What did it look like?NothingPhotos attached

The daywork record we build

  1. The contractor's supervisor opens a daywork record on their phone, choosing the instruction it relates to from the job's list.
  2. They record operatives, hours, plant and materials, picking from lists set up for the job so descriptions are consistent.
  3. Photos of the work before and after are attached.
  4. The site representative who is there on the day reviews and signs on the same phone or receives a link to sign on theirs.
  5. The signed record is timestamped and sent to both commercial teams straight away.
  6. Rates from the contract's daywork basis, as set up by the surveyor, are applied to produce a priced sheet for review.
  7. Approved dayworks flow into the valuation and the final account, linked to the instruction.

A signature on a daywork record confirms the resources used. Whether the work is payable as daywork is still a contractual question for the surveyor, and the record says so.

Dayworks without the arguments

Records reach the QS the day the work happens, signed by someone who saw it, with photos. Queries get raised while people remember. Month-end bundles become a list of already-seen, already-signed records, and the disputes that remain are about principle, not about who was on site.

Daywork totals are visible as they build up, too. If a contractor is running a lot of work on daywork, the client's surveyor sees it during the week rather than in the next valuation, and can decide whether a quotation for the remainder would be more sensible.

Is this your problem?

  • Daywork sheets arrive weeks after the work.
  • Sheets are unsigned or signed by someone who was not there.
  • You cannot tell which instruction a daywork relates to.
  • Dayworks are a regular source of dispute in final accounts.
  • Site managers complain about signing sheets they cannot check.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Do contractors need to install an app?

It can run as a web app on any phone, with no install, and it works offline with sync when signal returns.

Does a signature mean the daywork is accepted?

No. It confirms the resources recorded. Whether they are payable is decided by the surveyor under the contract.

Can we use it on the client side or the contractor side?

Either. The record is shared, which is what makes it useful to both.

What affects the cost?

The number of projects and users, whether it needs to link to your valuation or accounts system, and the rate structures to support.

Keep reading

More on Problems We Solve

Start here

Tell us which part of the QS process is slowing you down

Describe the process, the tools your surveyors use and where the time or the risk sits. We will tell you what we would build, what we would leave alone, and if a smaller change would fix it, we will say so. Commercial and contractual decisions stay with your team.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →