Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Keep Track of Manuscript Due Dates and Which Advance Instalments Are Owed?
Problems We Solve

How Do We Keep Track of Manuscript Due Dates and Which Advance Instalments Are Owed?

Delivery dates and advance instalments drift apart once a contract is signed. We build publishers a tracker that ties each payment trigger to the manuscript.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Advances are paid in instalments triggered by events such as signature, delivery and acceptance, or publication, and those events are recorded by editors while payments are made by finance. We build a tracker that holds each contract's instalments and delivery dates, records when each trigger happens and tells finance what is due, with the contract terms staying your own.

A signed contract and a spreadsheet of hope

The contract says a third of the advance on signature, a third on delivery and acceptance of the manuscript, and a third on first publication. The signature payment went out. The manuscript was due in March, arrived in May, went through a round of revisions and was accepted by the editor in an email in August. Finance heard nothing about it.

In October the agent writes, politely, to ask where the delivery payment is. Someone searches the editor's sent mail to find the acceptance date. Meanwhile, on another title, a payment was made on delivery even though the editor had not accepted the manuscript, because the spreadsheet only had a column for 'delivered'.

Why payment triggers get missed

The contract defines the trigger, the editor witnesses it, and finance pays it. Those are three people and usually three systems. The event that matters, acceptance, is often an informal email rather than a recorded step.

  • Delivery and acceptance are treated as one event when the contract separates them.
  • Extended delivery dates are agreed by email and never updated in the tracker.
  • Publication payments depend on the publication date, which moves in production.
  • Split advances across formats or territories are recorded as a single figure.
  • Agents' commission and invoicing details sit in a different file.

It is also common for the contract to say one thing and the editor's practice to say another. Some editors treat the first full draft as delivery, others wait for a revised draft. A tracker cannot settle that, but it records which event the editor has confirmed, and when, so finance and agents are working from the same fact.

What drifting delivery dates cost you

Late payments strain relationships with agents and authors, and early payments on unaccepted work are hard to recover. There is also a planning cost: a list plan that assumes manuscripts arrive on their contract dates will slip, and nobody notices until the catalogue is being written.

GapWhat follows
Acceptance not recordedDelivery payment is late and the agent chases
Extension not recordedThe book looks overdue and a false alarm goes out
Publication date movedThe publication instalment is paid in the wrong month
Instalments held as one figureNobody can say what remains unpaid on a contract
Overdue manuscripts not visibleThe seasonal list is built on books that will not arrive

The contract tracker we build

  1. A contract record per book with each advance instalment as its own line: amount, trigger event and status.
  2. Delivery due date and any agreed extensions, with the email or letter that agreed them attached.
  3. An editor's action to record delivery and, separately, acceptance, which is the event finance watches.
  4. A link to the publication date held in your production schedule or title management system, so the publication instalment follows it.
  5. A weekly list for finance of instalments whose trigger has happened but which are unpaid, with the payee and agent details.
  6. A list for the publisher of manuscripts past their delivery date, sorted by how soon they are needed for the list.

If you use Xero or QuickBooks, we can create the draft bill for each due instalment through their APIs so finance approves rather than retypes. The payment itself stays a finance decision.

What finance and editorial see from then on

Editors record acceptance where they already work, with a single action. Finance opens a list of what is due and why. When an agent asks, you can answer from the record rather than from memory, and the publisher can see which books are late before the sales conference, not after.

Your contracts keep saying what they say. The tracker only makes sure the events they depend on are written down.

Is this happening to you?

  • An agent has chased you for a delivery or acceptance payment in the last year.
  • Finance learns that a manuscript was accepted by asking the editor.
  • You cannot quickly list which advance instalments are still unpaid.
  • Extensions to delivery dates exist only in email.
  • Publication instalments are worked out by hand each season.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Will this interpret our contracts?

No. You or your contracts person enter the instalments and triggers from each contract. The system records events and flags what is due, it does not read legal meaning into clauses.

Can it handle advances paid through agents?

Yes. Each instalment records the payee, whether that is the agent or the author, and any commission detail you keep.

Do we need to enter old contracts?

Only the ones with instalments still outstanding. We can import them from your current spreadsheet.

Does it make payments?

No. It can prepare draft bills in your accounts package, and finance approves and pays them as now.

What affects the cost?

Mainly whether it connects to your accounts package and to an existing title or production system for publication dates.

Keep reading

More on Problems We Solve

Start here

Tell us where the admin sits in your publishing house

Describe how submissions, contracts, royalties and title data move around your list today: the inboxes, the spreadsheets and the reports your distributor sends. We will tell you what we would build and what we would leave alone, and if a smaller change would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →