How Do We Plan Deliveries and Collections for Our Low Loaders and Beavertails?

Plant hire transport planning on a whiteboard misses machine weights, trailer types and site rules. We build a planner for deliveries and collections.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Plant hire transport is hard to plan because every move depends on machine weight and size, the right trailer and tractor unit, site access and time windows, and collections that pop up with every off-hire. We build a planner that reads deliveries, collections and transfers from your hire system, matches each to a suitable vehicle, proposes runs, and puts them on drivers' phones with the site notes.

The transport board at half past four

Tomorrow has twelve deliveries, nine collections and three depot transfers. The transport manager has two low loaders, a beavertail, a couple of HIAB lorries and a van for small tools. A 13 tonne excavator can only go on the low loader. A site in the city centre wants delivery before seven because of loading restrictions. Three off-hires came in this afternoon, and the customers want them collected tomorrow.

It all goes on a whiteboard with magnets, and when the transport manager is on holiday the whole depot feels it.

Why plant transport doesn't fit ordinary route planning

A plant move is not a parcel. Each one has a machine with a weight and dimensions, a set of vehicles that can carry it, a site that may or may not take a big vehicle, and often a collection that can be combined with it.

ConstraintExample
Machine weight and sizeExcavator needs the low loader, not the beavertail
Vehicle and trailerHIAB for welfare units, van for small tools
Site accessNarrow entrance, no room to turn an artic
Time windowCity site before 7am, school site outside term times
PairingDeliver to one site and collect from the next
Driver hoursLegal limits and depot start times

Most of that is knowledge in the transport manager's head, and the hire system only knows that a machine needs delivering.

What poor transport planning costs

Empty running when a delivery and a nearby collection are not paired. Wrong vehicles sent to sites that can't take them. Late deliveries on job start days, which contractors remember. Off-hired machines left on site for days, earning nothing and at risk. And one person carrying the whole operation in their head.

Customers feel it most on the first day of a job. A groundworks crew standing around a site at eight o'clock waiting for an excavator costs the contractor a morning, and they will remember which hire company caused it when the next job is priced. Being reliable on delivery is often what separates hire companies whose rates are otherwise similar.

A transport planner we build

  1. Deliveries, collections and transfers are read from your hire system daily, with the machine, site address and requested time.
  2. Each machine category has its transport weight and dimensions, and each vehicle has what it can carry, so the planner knows which moves each vehicle can take.
  3. Site notes are stored per address: access, time windows, contact, and restrictions your drivers have reported.
  4. The planner proposes runs per vehicle and driver, pairing deliveries and collections where it saves a trip, and shows moves it couldn't fit and why.
  5. The transport manager adjusts by dragging moves between runs and locks anything they know better.
  6. Runs go to drivers' phones in order, with site notes and contacts, and drivers record delivery and collection with photos and times.

Legal driving hours and load securing remain your transport manager's and drivers' responsibility. The planner shows planned hours so they can be checked against your own rules, but it does not decide what is compliant.

The transport office afterwards

Tomorrow's plan starts as a draft. Collections from off-hires drop in with a suggested vehicle. Drivers get their runs on their phones with the notes they need. Customers can be told a delivery window. And if the transport manager is off, someone else can run the plan because the knowledge is in the system rather than on the whiteboard.

Signs your transport needs this

  • Plans are made on a whiteboard or spreadsheet.
  • Only one person can plan transport properly.
  • Low loaders run empty on the way back more often than they should.
  • Wrong vehicles are sent to sites that can't take them.
  • Off-hired machines wait days for collection.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Can it handle transfers between depots?

Yes. Transfers are planned alongside deliveries and collections, and can fill gaps in runs that would otherwise be empty.

Do drivers need new devices?

Usually not. The driver app runs on ordinary phones and works offline where sites have no signal.

Does it replace our tachograph or telematics system?

No. It plans work. Driver hours records stay in your existing systems, and we can show planned hours alongside them.

What affects the cost?

The number of vehicles and depots, how your hire system exposes moves, and whether a driver app is included.

Keep reading

More on Problems We Solve

Start here

Tell us where your fleet paperwork slips

Describe your fleet, your depots and the hire system and spreadsheets you use today. We will tell you what we would build and what we would leave alone, and if a change inside your hire system would do the job, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →