What Actually Happens During a Build

How a custom PHP project runs week by week: discovery, a core workflow live early, a typical twelve-week shape, and what we need from you at each stage.

Updated 2 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Discovery, then the core workflow in production early, then extend. Your time is concentrated at the start and at each review, and it should be booked in advance.

Get something into production early

The most useful thing a project can do is put one working workflow in front of real users within a few weeks. Everything after that is informed by how they actually use it.

A system that reaches users in week six and is extended for three months produces a better result than one designed completely and delivered in month four.

A typical twelve-week shape

WeeksWhat happens
1–2Discovery: process, data, systems, access
3–5Core workflow built and reviewed
6First release to a small group
7–10Extension based on real use, plus integrations
11Reporting, permissions, edge cases
12Full rollout and handover

What we need from you

  1. Week 1: access to every system, requested immediately
  2. Weeks 1–2: two to three days from whoever knows the process
  3. Week 5: half a day reviewing the core workflow with real users
  4. Weeks 7–10: feedback within a day or two, consolidated
  5. Week 12: a decision to go live, and someone available on the day

Access is the most common cause of delay and it is entirely preventable by requesting everything on day one.

Feedback from one voice

Four people giving contradictory feedback separately is the second most common cause of delay. One person collecting and resolving it internally, then sending one response, keeps a project moving.

That person also needs authority to decide, or the consolidation just moves the disagreement rather than resolving it.

Scope additions go into phase two

Things will occur to people during the build. That is healthy and it should not silently expand the current phase.

We record them, price them, and they go into a phase two list. Nothing is lost and the current date holds.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Can a project go faster?

By narrowing scope, yes. Compressing the same work usually moves the time into fixing things afterwards.

What if requirements change during the build?

Small clarifications are absorbed. Genuine additions are priced and scheduled. Both are normal and both should be visible.

How much of our time will it take?

Two to three days in discovery, then a few hours a week. Booked in advance it is manageable; assumed as ad hoc it causes slippage.

What happens after launch?

A month of small fixes as real use reveals things, included. Then a maintenance arrangement or handover to your team.

Keep reading

More on PHP Development

PHP Development

Why PHP Is Still a Sensible Choice

Is PHP still a good choice for business applications? Where modern, typed PHP fits, where another language is better, and the hosting and hiring arguments.

PHP Development

Improving Old Code Without a Rewrite

Modernising a legacy PHP application without a rewrite: move to a supported PHP version, add tests around what matters, then strangle rather than replace.

Start here

Want to know what your project would look like?

Tell us the process and we will map the phases, with the dates we would need your people.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →