Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Make Sure a Repeat Box or Carton Order Is Made to the Latest Spec and Not the Last Job Ticket?
Problems We Solve

How Do We Make Sure a Repeat Box or Carton Order Is Made to the Latest Spec and Not the Last Job Ticket?

Packaging repeat orders get made to an outdated spec because the change lives in an email. We build version controlled product specs that jobs must follow.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Repeat orders go wrong because the job is copied from the last job ticket, while the customer's change to board grade, dimensions or print was agreed in an email that never reached the product record. We build version controlled product specifications with a clear change process, so every change is recorded, approved and linked to tooling and artwork, and a repeat order always uses the current version.

Made perfectly, to last year's spec

A customer changed their shipper case from one board grade to a lighter one to save cost, agreed with your sales rep by email. They also asked for the internal length to grow slightly to fit a new product. Three months later a repeat order arrives. The job is copied from the previous job in the MIS, which predates the change, and the cases are made to the old specification.

The customer's packing line rejects them. Now there is a reprint, a disagreement about who pays, and a customer asking whether they can trust the next delivery.

Repeat jobs copy the last job

In many plants the product specification is effectively the last job ticket. Changes are agreed by sales or technical, often in email or on a call, and they reach production only if someone updates the product record before the next order. Nothing stops a repeat from being copied from an outdated job.

  • Changes are agreed by email and not recorded against the product.
  • Repeat orders are created by copying the previous job.
  • Tooling and artwork are not tied to a spec version.
  • Nobody formally approves a spec change.
  • The customer's own spec reference is not linked to yours.

The cost of making the wrong version

Making to the old spec means rework, waste and delivery delays, and it puts the account at risk because it looks like carelessness. Tooling may need to be changed at short notice. Where a change was missed on a food or pharmaceutical customer's packaging, it may also raise questions for their quality team. Every repeat order carries the risk that some forgotten change is waiting.

The change process itself becomes a source of friction. Sales feel they told production, production feel nobody told them, and the customer only cares that the cases do not fit. Without a record of who agreed what and when, every incident turns into an argument about memory.

Specification control we build

  1. Each product has a specification record: style, dimensions, board or substrate, print, finishing, packing and palletisation, the customer's own reference, and linked forme, plates and approved artwork.
  2. Every change creates a new version, with what changed, why, who requested it and when it takes effect.
  3. Changes go through an approval step with sales, technical and, where needed, the customer, before the version becomes current.
  4. Repeat orders are created from the current version of the product, not from a previous job. Copying an old job is blocked or flagged.
  5. If a change affects tooling or artwork, the new version cannot be released until the matching forme and plates are recorded.
  6. The job ticket shows the spec version number and highlights what changed since the last run, so the floor knows to look.
SituationNowWith specification control
Change agreed by emailMight reach the product recordRecorded as a new version
Repeat orderCopied from the last jobBuilt from the current version
Tooling change neededFound at make-readyBlocks release until ready
Floor awarenessNoneChanges highlighted on the ticket
Dispute laterSearch emailsVersion history with approvals

What changes for the team

Everyone works from the same specification. Changes are captured when they are agreed, and approvals are visible. The floor sees what is different about this run. And when a customer queries a delivery, the version history shows exactly what was agreed and when.

Could a repeat order catch you out?

  • Repeat orders are copied from the last job.
  • Spec changes are agreed by email.
  • You have made a repeat order to an old specification.
  • Tooling and artwork versions are not tied to the product.
  • The floor cannot see what changed since the last run.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does this replace our MIS product records?

Where your MIS can hold versioned specifications, we configure and connect to it. Where it cannot, we build the specification control alongside and feed jobs into the MIS.

Do customers have to approve every change?

Only the changes you choose. Internal changes may need internal sign off only. You set the rules.

Can it import our existing specs?

Yes. Current products are imported as version one from your MIS or spreadsheets, and history builds from there.

What affects the cost?

The number of products, how your MIS stores specifications, and how much tooling and artwork linking is required.

Keep reading

More on Problems We Solve

Start here

Tell us where orders slow down between enquiry and despatch

Describe what you make, board, carton or flexible, the machines on the floor and the MIS or spreadsheets you run on. We will tell you what we would build around them and what we would leave alone, and if your existing MIS can already do it with the right setup, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →