How Do We Stop Deliveries Arriving Unannounced on a Tight Site While Others We Called Off Never Turn Up?

Main contractor deliveries arrive unbooked while call-offs go missing. We build a delivery booking and call-off tracker that suppliers and the gate both use.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Deliveries go wrong because call-offs are made by phone and email by several people, and the gate has no list of what is expected. We build a delivery booking system where every call-off becomes a booked slot, suppliers confirm or move it, the gate sees the day's expected deliveries, and each arrival is checked in against what was called off.

A wagon at the gate, the crane already busy

It is ten in the morning on a city-centre site with one loading bay. A flatbed of plasterboard arrives that nobody booked, while the crane is lifting steel and the concrete wagons are due. The driver waits, then leaves. Meanwhile the windows the site manager called off for today are nowhere, and when the office rings the supplier they say the call-off was for next Tuesday.

Everyone on site has a story like this. The site manager called off some materials, the package manager called off others, subcontractors arranged their own, and nobody had the full list.

Why deliveries collide

Call-offs are spread across people and channels. A merchant gets a phone call, a manufacturer gets an email, a subcontractor arranges its own materials with its own suppliers. The site's delivery plan, if there is one, is a spreadsheet the gate person was sent last week. There is no single list of what is coming, when, and on what vehicle.

  • Several people call off materials without seeing each other's bookings.
  • Suppliers confirm by phone, so dates are only in someone's memory.
  • Subcontractors' own deliveries are invisible until they arrive.
  • The gate has no list to check arrivals against.
  • Loading bay, crane and hoist time are not booked alongside deliveries.

What bad delivery planning costs

Rejected or waiting wagons, redelivery charges and materials left in the wrong place. Trades standing because what they need was called off for the wrong day. Crane or hoist time lost to unplanned lifts. On a tight site, deliveries that cannot be accommodated cause knock-on delays and friction with neighbours and the local authority over parking and access.

The office loses time too. Every missed or unexpected delivery means calls to the supplier, the subcontractor and the site manager to find out what happened, and the answers conflict.

The booking system we build

  1. Every call-off, from the site team, package managers or subcontractors, is made through one booking form, choosing a date, time slot and any crane, hoist or bay needed.
  2. The form shows slots already taken, so two big deliveries cannot be booked into the same bay at the same time.
  3. The supplier gets a booking reference and a link to confirm, move or cancel. Changes show immediately on the site's plan.
  4. Suppliers receive the site's delivery rules and route with the booking: gate, times and contact.
  5. The gate person sees today's expected deliveries on a tablet and checks each one in, with a photo of the delivery note.
  6. Arrivals that were not booked are logged as unbooked, so the site team can speak to whoever arranged them.
  7. Late or missing deliveries are flagged to the person who made the call-off while there is still time to act.
QuestionBeforeWith booking
What is arriving today?Ask aroundGate list on a tablet
Is the crane free at eleven?Phone the site managerShown on the booking form
Did the windows get confirmed?Somebody's memorySupplier confirmed in the system
Who booked this wagon?Nobody knowsNamed on the booking
Did it all arrive?Check the paper note laterChecked in with a photo

A site that knows what is coming

The gate knows what to expect and who to call. Deliveries are spread across the day rather than stacked at eight o'clock. Suppliers can see and move bookings themselves, which cuts phone calls. Subcontractors' deliveries are part of the plan instead of a surprise. And the delivery record joins up with purchase orders and invoices, so the office knows what actually arrived.

Signs your deliveries need a booking system

  • Deliveries arrive that nobody on site booked.
  • Called-off materials turn up on the wrong day.
  • The gate works from a spreadsheet or a whiteboard.
  • Crane or hoist time clashes with deliveries.
  • Suppliers and subcontractors book by phone with different people.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Do suppliers need an account?

No. They use the booking link they receive. Regular suppliers can have a simple login to see all their bookings if they want one.

Can subcontractors book their own deliveries?

Yes, and that is one of the main reasons to do it. Their bookings sit on the same plan as yours.

Does it work across several sites?

Yes. Each site has its own slots and rules, and the office sees them all.

Will it work with our purchase orders?

Where orders are raised in a system we can read, a booking can be linked to the order it fulfils.

What affects the cost?

The number of sites, whether you want crane and hoist booking, and the systems we link to for orders and deliveries.

Keep reading

More on Problems We Solve

Start here

Tell us where your sites and office lose time

Describe the problem, the systems your site managers and office use, and how many live projects you run. We will tell you what we would build and what we would leave alone, and if a change inside the software you already pay for would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →