How Do We Make Sure the Kitchen Design We Order Is the One the Customer Signed?

Kitchen design revisions pile up and the wrong version gets ordered or fitted. We build sign-off tracking so only the approved plan reaches ordering and site.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer: TL;DR

The wrong kitchen design reaches ordering because revisions are saved as loose files and emailed back and forth, with nothing marking which one the customer actually approved. We build a sign-off step where each revision is logged, the customer approves a specific version electronically, and only that approved version, with its drawings and schedule, can be released to ordering and to the fitters.

Revision F, or was it G?

The customer asked for the island to move 100mm, then for the bin pull-out to swap sides, then for the wall units to go up to the ceiling. Each change produced a new render, a new plan and a new price. The designer saved them as Smith kitchen v4, Smith kitchen v4 final and Smith kitchen v5 FINAL. The order went in from v4 final. The customer had signed v5.

It surfaces on fitting day when the fitter opens the boxes and the tall units are the wrong height, or three weeks later when the customer asks where the second pull-out has gone.

How versions get crossed

Design software is good at drawing kitchens. It is not built to manage which version has been agreed with the customer, who ordered from which version, and what changed between them. That knowledge ends up in email threads and file names.

  • The customer signs a printout or replies to an email saying it looks good, and that approval is not linked to a file.
  • Small changes agreed on the phone are made to the plan but never re-sent for approval.
  • The person placing the unit order is not the designer, and picks the file that looks newest.
  • Fitters receive drawings from an earlier stage in a job pack printed weeks before.
  • The price on the final version is different, and the invoice uses the older figure.

The price of one crossed version

Reordering units means waiting for the manufacturer again, with the customer's kitchen half built. Some suppliers charge for returns or will not take bespoke items back at all. The fitters' schedule has to be rearranged. And the conversation with the customer is difficult, because from their side they asked for something clearly and did not get it.

The approval step we add

  1. Each design revision is uploaded to the job as a numbered version with its plan, elevations, render, schedule and price, and a short note on what changed.
  2. The customer receives a link to review a specific version and approves it with an electronic signature, or asks for changes in writing on the same page.
  3. Only one version per job can be marked approved, and it is locked. Any later change creates a new revision that needs its own approval.
  4. The ordering screen will only release the approved version's schedule to suppliers.
  5. The fitters' job pack is generated from the approved version, and a warning appears if a newer approval arrives after the pack was issued.
  6. The invoice and stage payments are taken from the approved version's price.
MomentTodayWith version sign-off
Customer agrees a changePhone call, maybe an emailNew revision, approved on screen
Placing the orderPick the newest-looking fileOnly the approved version can be ordered
Fitters' drawingsPrinted early, may be out of dateGenerated from the approval, flagged if superseded
Final invoicePrice copied from a quotePrice from the approved version

Your designers keep using the design software they know. We work with the files and schedules it already exports.

After the change

Anyone in the business can open a job and see which version the customer approved, when and what changed from the one before. Ordering happens from that version and nothing else. Disputes about what was agreed get settled by looking at the signed revision rather than by memory.

Checklist: is version control hurting you?

  • You have ordered or fitted something from an out of date design.
  • File names include words like final, latest or use this one.
  • Customer approvals are emails that do not name a version.
  • Fitters have been working from drawings that were later changed.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly. A senior engineer reads every question.

Ask about your project

Does this replace our kitchen design software?

No. Designers keep drawing in what they use now. We take the exported plans, schedules and prices and manage the versions and approvals around them.

Do customers need to create an account to approve?

No. They receive a secure link, review the version and sign on the page.

What about bathroom designs?

The same process works for bathrooms, including tile layouts and sanitaryware schedules.

What affects the cost?

What your design software can export, whether ordering goes to suppliers electronically, and whether the approval connects to your accounts system.

Is an electronic approval good enough for our terms?

That is for your own terms of business and your adviser to decide. The system records who approved which version and when, which gives you a clear record either way.

Keep reading

More on Problems We Solve

Start here

Tell us where your kitchen and bathroom jobs slip

Describe how a job moves from enquiry to handover in your business, which design and accounts software you use, and where things get lost. We will tell you what we would build and what we would leave alone, and if a better habit or a setting in your existing software would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate, with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →