Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do I Keep Every Bespoke Jewellery Commission on Track From Sketch to Handover?
Problems We Solve

How Do I Keep Every Bespoke Jewellery Commission on Track From Sketch to Handover?

Bespoke jewellery commissions stall between design, casting and setting. We build a stage tracker so jewellers see every commission and what is next.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Bespoke commissions go wrong in the gaps between stages: design agreed but metal not ordered, casting back but the stone not yet in, setting done but nobody told the customer. We give each commission a set of stages that match your workshop, a clear owner and date for the next step, and one board showing every piece in progress.

Nine commissions and one notebook

Bespoke work is often the most rewarding part of an independent jeweller's business, and the most tangled. At any moment you might have an engagement ring waiting for the customer to choose between two centre stones, a pair of wedding bands at the casters, a pendant made from a grandmother's brooch waiting on the setter, and a signet ring that needs hand engraving before it goes for hallmarking.

Each has its own story in your head, in a notebook, in a WhatsApp thread with the customer and in emails with the stone dealer. It mostly works while you are there. Then you take a week off in August, and the person covering has no idea that the bands need collecting from the caster by Friday or the wedding date is at risk.

Why commissions slip between stages

A bespoke piece passes through many hands: you, the customer, a CAD designer, a caster, a stone supplier, a setter, an engraver, the assay office. Each hand-off is a point where the job can sit, because the next person has not been told it is their turn.

Most jewellery point of sale systems treat a commission like a large repair: a description, a price, a deposit and a due date. They do not model stages. So the real status lives in the owner's memory, and the due date is only checked when it is close.

Customers make it harder by being slow at the decision points. A customer who takes three weeks to approve a design pushes every later step back, but the wedding date does not move.

What drifting commissions cost

Where it slipsWhat it costs
Design approval waitsLater stages compressed into a panic before the date
Stone not ordered in timeSetting delayed while the dealer sources it
Casting not chasedWax or metal sat at the caster for days
Hallmarking forgottenA finished piece that cannot yet be sold as described
Customer not updatedAnxious calls and less trust in a costly purchase

Bespoke customers are spending a lot of money on something emotional. They tend to tell other people about the experience, good or bad. A commission that arrives just in time after a stressful month earns a different story from one where the customer felt looked after all the way through.

The commission tracker we build

We design the stages around how your workshop actually works, not a generic project tool.

  1. Each commission is created with the customer, the occasion date, the budget agreed and a template of stages that suits the piece, for example consultation, design, CAD approval, deposit, metal and stone ordering, casting, setting, finishing, hallmarking, final payment and handover.
  2. Every stage has an owner (you, the bench jeweller, an outside trade or the customer) and a target date worked back from the occasion date.
  3. A board shows all commissions as cards moving across the stages, with anything late or waiting on the customer highlighted.
  4. When a stage is waiting on an outside trade, the system records who has it and when it is due back, so chasing is based on dates rather than memory.
  5. When a customer decision is needed, they get a message with what they need to decide, and reminders if it waits too long.
  6. Notes, sketches, photos and emails are kept on the commission, so anyone covering can pick it up.

If you already use a CRM or project tool you are comfortable with, we can build the stages there instead of starting from scratch.

How the week looks with a board

On Monday morning you look at one screen. Two commissions are waiting on customer decisions, one is overdue at the caster, and the wedding bands need to go for hallmarking by Thursday to be back in time. You make three calls and the week is planned.

  • Every commission's current stage and next step in one place
  • Target dates worked back from the customer's occasion
  • Customer decisions chased automatically
  • Anyone covering can see what each commission needs

The creative part stays with you. The system just holds the thread, so it is not all in your head.

Is this how bespoke work feels in your shop?

  • Commission status lives mainly in the owner's memory.
  • You have rushed a piece to meet a wedding or proposal date.
  • Casting, setting or hallmarking dates are not tracked anywhere shared.
  • Customer approvals are scattered across WhatsApp, email and phone.
  • Holidays are difficult because nobody else knows where commissions stand.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Is this different from our repair tracking?

It can share the same system, but commissions need stages, customer decisions and outside trades in a way a repair ticket does not. We design both to sit together where it makes sense.

Can customers see the progress of their commission?

We can send updates at stages you choose, such as casting complete, and optionally give them a private page with photos. Many jewellers prefer to control what is shown.

How long does it take to set up the stage templates?

That depends on how many types of piece you make. We usually start with your most common commissions and add others as you use it.

Do our casters and setters need to use it?

No. They carry on as normal. You or your staff record when pieces go out and come back.

What do you need from us?

A walk through two or three recent commissions, the stages each went through and where they got stuck.

Keep reading

More on Problems We Solve

Start here

Tell us how bespoke and valuation work runs in your shop

Describe how commissions and valuations move from first enquiry to handover, what you use to keep track today and which step causes the most chasing. We will tell you what we would build or connect, and if a smaller change would sort it, we will say that instead.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →