Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
Business Automation

How We Build an Automation System, Step by Step

Last updated:

Phase one: we watch the work happen

We do not start from a requirements document. We start by watching somebody do the task, because what people describe and what people do are reliably different, and the difference is where projects fail.

That means a screen recording, a shadowing session, or sitting with whoever handles the awkward cases. One hour of watching produces more usable specification than a day of meetings.

Phase two: a written scope with a fixed price

You get the workflow written as numbered steps, the exception list, the systems it touches, a phased plan and a fixed price for phase one. You own that document and can take it to another supplier.

The exception list is the part we spend the most time on. A scope with fewer than five exceptions in it is not finished, and we will keep asking until we have them.

Phase three: build, with something running every fortnight

You see working software every two weeks, not a status report. Early demonstrations are rough on purpose — the point is that you can click through the actual path and tell us where it is wrong while changing it is cheap.

  • One named developer, whom you meet before signing
  • Fortnightly demonstration with your team, not just the sponsor
  • Changes logged and priced, including the ones we absorb
  • Code in your repository from day one

Phase four: parallel running, then cutover

For two to four weeks the automation runs alongside your manual process and the outputs are compared. It feels like duplicated effort and it is the cheapest insurance available — it finds the 5% of cases nobody mentioned while they still cost an afternoon rather than a customer.

Only when the comparison is clean do we cut over, and the manual route stays available for a defined period afterwards.

What we need from you

  1. One person who can make decisions, about half a day a week
  2. Questions answered within a day or two
  3. Real data, including the awkward records, for testing
  4. Attendance at the demonstrations with actual feedback

Projects where the client does these finish two to three weeks earlier than identical scopes where they do not. It is the largest variable we do not control.

Frequently asked questions

How long does a first automation take?

Six to twelve weeks from signed scope for a single process, including the parallel-running period. Faster is possible by cutting scope, never by cutting testing.

What does it cost?

£5,000–£15,000 for one well-defined process. We quote a fixed price against a written scope, so the number does not move mid-project.

Do we have to replace our existing systems?

Usually not. Most of what we build sits alongside what you already run and talks to it. Replacing an ERP and automating a process at the same time is two hard projects blaming each other.

What happens if it does not work?

You will know by the parallel-running stage, which is well before cutover and before the final payment milestone. That is deliberately how the phases are ordered.

Keep reading

Want to see what phase one would look like for you?

Tell us what happens in your business today and we will map the process, the exceptions and a fixed price for the first phase.

Book a free 30-minute call Get a project estimate WhatsApp us

Related services

What we build for problems like this one

Business AutomationCustom Software Development