UK-registered +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Plan Part Loads So Trailers Leave Full Instead of Half Empty?
Problems We Solve

How Do We Plan Part Loads So Trailers Leave Full Instead of Half Empty?

Haulage part-load planning is done by eye, so trailers leave half full. We build a tool that groups part loads by route, space and timing for the planner.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer: TL;DR

Part loads go out half full because the planner is fitting pallets, weights, collection times and drop orders together in their head, from orders that arrive all day in different formats. We build a planning tool that holds every part-load order with its pallet spaces, weight and time windows, suggests groupings that share a route and fit the trailer, and shows the planner the drop sequence and remaining space, so they decide with the whole picture in front of them.

Six pallets here, four there

The part-load orders for tomorrow are in: six pallets from a food packaging customer going to Bristol, eight pallets from a builders' merchant to Exeter and Plymouth, four to Swindon with a tail-lift requirement, and a late one for Taunton that came in at four. The planner builds loads on a whiteboard, adding up pallet spaces and weights and trying to remember which drops have time windows.

Two trailers go out two-thirds full, one of them doubling back on itself because the Taunton drop was bolted on at the end, and an order that could have filled one of them goes on a third truck because it came in after the plan was done.

Why grouping stays manual

Grouping part loads is a real puzzle, and it gets harder the more orders you have. The planner is juggling several constraints at once without anything to add them up.

  • Pallet spaces and weights vary, including over-height and non-stackable pallets.
  • Some drops need tail-lifts or have narrow time windows.
  • Orders arrive by email, phone and spreadsheet throughout the day.
  • Drop sequence affects loading order, so the plan also has to work on the trailer.
  • Late orders arrive after loads are built, and rebuilding is tempting to skip.

What half-full trailers cost

A trailer that leaves with spare space costs nearly as much to run as a full one, so part-load margin depends on fill. When loads are built by eye, you run more trucks than needed on some days and turn work away on others. Late orders get expensive dedicated runs. And the experienced planner who is good at this becomes a single point of failure.

The part-load planner we build

  1. Part-load orders are captured in one list, from a customer web form, an email parser for regular senders, or imports from customers' systems, with pallet count, type, weight, dimensions and delivery requirements.
  2. Each order is located on a map with its collection and delivery windows.
  3. The tool suggests groupings that follow sensible routes and fit your trailer's pallet spaces and weight, respecting tail-lift and time window needs.
  4. For each suggested load it shows drop order, loading sequence (last drop on first), remaining space and any tight time windows.
  5. The planner moves orders between loads by dragging them, and the tool rechecks space, weight and timing as they do.
  6. Late orders are offered to existing loads with space on the right route before a new truck is considered.
Planning stepWhiteboardPlanning tool
Collecting ordersSeveral inboxes and phonesOne list
Fitting space and weightMental arithmeticChecked as loads are built
Route groupingPlanner's knowledgeSuggested, then adjusted
Drop and load orderWorked out at the bayShown per load
Late ordersOften a separate truckOffered to loads with space

How planning changes

The planner is still in charge, and still knows things the tool does not, like which customer's forklift driver takes lunch at twelve. What changes is that the arithmetic is done for them, and every order is visible at once. Trailers leave fuller. Late orders have a better chance of finding space. And a second planner can build loads that make sense even when the experienced one is off.

Is this your part-load operation?

  • Loads are built on a whiteboard or in a spreadsheet.
  • Trailers regularly leave with space you could have sold.
  • Late orders go on extra trucks.
  • Only one planner is really good at grouping.
  • Orders arrive in several different formats.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly. A senior engineer reads every question.

Ask about your project

Will the tool build loads automatically?

It suggests groupings. The planner accepts, changes or ignores them.

Does it handle different pallet types?

Yes. Standard, half and quarter pallets, over-height and non-stackable items can all be set up.

Is this for pallet network work?

It is for your own part-load operation. If you also exchange freight through a pallet network, the tool can mark those pallets separately.

Can it read orders from customer emails?

Yes, for regular senders with a consistent format. Others use a simple web form.

What affects the cost?

How orders arrive, how many constraints need modelling, and whether it has to write back into your transport management system.

Keep reading

More on Problems We Solve

Start here

Tell us what your haulage yard is still doing on paper

Describe your fleet and trailers, where your loads go, and which tasks still run on paper, whiteboards or phone calls. We will tell you what we would build and what we would leave alone, and if the system you already pay for can do it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate, with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →