Groundworks price gangs and contracts managers measure metres and plots differently. We build item-by-item agreement per run and plot, with rates and CIS.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Price-work payments cause arguments because the gang's claim and the contracts manager's measure are made separately, from memory, at the end of the week. We build a price-work record where completed work is logged by plot or run as it is done, checked and agreed by the contracts manager on a phone, priced at the agreed rates, with CIS deductions applied where they apply, so the weekly payment is a total of items already agreed.

Friday, and the gang's number is higher

Your drainage gang and one of your foundation gangs work on price: so much per metre of pipe at each depth band, per manhole, per plot for foundations. On Friday the ganger phones in what they have done. Your contracts manager has his own idea from walking the site. The numbers differ. Somebody gives way, grudgingly, and next week it happens again.

Neither side is being dishonest. They are measuring different things, at different times, from memory.

Why price-work measures are disputed

Price work pays for quantities done, but the quantities are not recorded at the time. The gang measures what it thinks it finished. The contracts manager measures what he saw. Part-done items, such as a run laid but not backfilled, are treated differently by each side. And the rates themselves are sometimes on a piece of paper from months ago.

  • Quantities are worked out at the end of the week, not as done.
  • Part-complete items are counted differently by each side.
  • Agreed rates are not written down clearly.
  • Extras and dayworks for price gangs are agreed verbally.
  • CIS deductions are calculated separately by the office.

What disputed measures cost

Overpaying for work not done, or underpaying and losing good gangs. Weekly arguments that damage relationships with gangs you rely on. Office time reworking payments and CIS. And no record to settle a disagreement later, or to show what a gang was paid for on a particular plot.

The price-work record we build

  1. Each price gang's agreed rates are recorded: per metre by depth band, per manhole, per plot stage, and any others, with the date agreed.
  2. As work is completed, the ganger logs it on a phone by plot or run, with a photo, choosing from the items the gang is on price for.
  3. Part-complete items are logged with a stage, such as laid not backfilled, and paid at the proportion you agree, or not until complete.
  4. The contracts manager checks and agrees items during the week on a phone, or queries them with a note.
  5. Extras and dayworks for the gang are logged with the instruction that authorised them.
  6. At the end of the week, the payment is the total of agreed items at agreed rates. CIS deductions are applied at each gang's recorded rate where CIS applies, and statements are produced.
  7. Payments go to your accounts or payroll system, and each gang can see its own record.
ItemLogged by gangContracts managerPaid
Run F4 to F5, deep bandMonday, with photoAgreedThis week
Manhole F5TuesdayAgreedThis week
Run F5 to F6Wednesday, laid not backfilledAgreed at stagePart this week
Plot 22 foundationsThursdayQueried, depthNext week once agreed

The rates and terms you agree with gangs, and their employment or self-employed status, are matters for you and your advisers. We record and apply them.

Fridays without the argument

Items are agreed during the week, one at a time, while the work is visible. The weekly payment is a sum of things both sides already accepted. Gangs trust the process because they can see their own record. The office no longer reworks payments or CIS. And you can see what each gang produced, at what cost per unit, which is useful when pricing and when choosing gangs.

Is price-work pay a weekly argument?

  • Price gangs and your contracts manager measure separately.
  • Part-complete work causes disagreements.
  • Rates are on old bits of paper.
  • Extras for price gangs are agreed verbally.
  • The office reworks payments and CIS by hand.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Can price gangs see their own records?

Yes, through a link on the ganger's phone, showing items logged, agreed and paid.

Does it handle CIS?

It applies each gang's recorded CIS rate and produces statements. Your accountant or adviser confirms how CIS applies.

What if we pay gangs by the plot instead?

Plot rates work the same way, by stage, with photos.

Can it compare price gangs with our own employed gangs?

Yes, if activity costing is also in place, cost per unit can be compared.

What affects the cost?

The number of price gangs and rate types, and your accounts and payroll systems.

Keep reading

More on Problems We Solve

Start here

Tell us where your groundworks jobs leak time and money

Describe the problem, how your gangs, plant and office work today, and which main contractors or housebuilders you work for. We will tell you what we would build and what we would not, and if a spreadsheet or your existing software would do the job, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →