How Do We Keep Track of Street Works Applications for Sewer and Access Connections in the Public Road So Gangs Are Not Turned Away?

Groundworks connections in the public road stall on road space bookings and notices. We build a tracker with application dates, traffic plans and reinstatement.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Connections in the public highway stall because each one needs the highway authority's agreement for the dates, a traffic management booking and later reinstatement records, and those are handled by email by whoever applied. We build a highway works tracker that lists every connection or access job in the road with its application, required notice, approved dates, traffic management booking and reinstatement records, and warns you when dates or notices are at risk.

A gang at the road, no approval to dig

Your site needs a foul sewer connection in the main road and a new bellmouth for the site access. The application to the highway authority went in, but the dates approved were not the ones the gang was planned for. Traffic lights were booked for the original week. On Monday the gang arrives, the traffic management firm arrives, and the approval is for next month.

Nobody made a mistake on their own. The application, the approval, the traffic management and the gang plan were each handled by a different person, and nobody joined them up.

Why highway works go wrong

Work in the public highway has its own process with the highway authority, often through their permit or noticing system, with required notice periods, conditions and approved dates. Your part of it is handled alongside everything else by a contracts manager or an office administrator. Traffic management is booked separately. Reinstatement records are needed afterwards and are often forgotten.

  • Applications are made by one person and approvals arrive by email.
  • Approved dates differ from requested dates and the gang plan is not updated.
  • Traffic management bookings are separate from the approval.
  • Conditions attached to approvals are not passed to the gang.
  • Reinstatement records and photos are not kept together.

What mismatched highway works cost

Gangs and traffic management paid for days they cannot work. Connections delayed, holding up drainage commissioning or site access. Possible penalties or disputes with the highway authority where conditions or dates were not followed, which is a matter your advisers will want to handle. And reinstatement problems later that you cannot answer because the records are scattered.

The highway works tracker we build

  1. Every job in the public highway is listed: connections, access works, service trenches, with location and the highway authority.
  2. For each, the application, the required notice period, the requested and approved dates and any conditions are recorded. Approval emails are read and filed against the job.
  3. The gang plan and the traffic management booking are linked to the approved dates. If the approval changes, both are flagged.
  4. Conditions, such as working hours or traffic arrangements, are passed to the ganger on a phone with the job.
  5. On the day, the gang records start and finish, and photos of the site set-up.
  6. Reinstatement is recorded with photos, layers and dates, and any interim or permanent reinstatement due later is tracked.
  7. Upcoming jobs whose notice period is close, or approvals not yet received, are shown to your contracts manager each week.
JobApprovalTraffic managementGang
Foul connection, main roadApproved, later datesRebooked to matchReplanned
Site access bellmouthAwaiting approvalProvisionalOn hold
Water main crossingApprovedBookedPlanned

What notices, permits and conditions apply is set by the highway authority and your advisers. We track them; we do not apply on your behalf unless you want that built in, and even then a person submits.

Highway works that happen on the day planned

Gangs and traffic management are only booked for approved dates. Conditions reach the gang. Approval changes are caught on the day they arrive. Reinstatement records are complete and easy to find if the highway authority asks. And your contracts manager sees upcoming highway work early enough to apply in good time.

Do your highway connections look like this?

  • Gangs have turned up to highway work without approval for that date.
  • Traffic management is booked separately from approvals.
  • Conditions on approvals do not reach the gang.
  • Reinstatement records are hard to find.
  • Applications go in late because nobody saw the work coming.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does it connect to the highway authority's system?

Applications are usually made through the authority's own system or a noticing service. We track them and read the emails they send.

Can it book traffic management?

It can send the booking request to your traffic management firm with the approved dates. They confirm.

Does it cover work by utility companies on our sites?

It can track their dates as dependencies, if you want to see them alongside your own.

Does it tell us what notice is required?

No. You set the notice periods and requirements with your advisers, and the tracker applies them.

What affects the cost?

The number of highway jobs, the authorities involved, and whether we link to your gang allocation.

Keep reading

More on Problems We Solve

Start here

Tell us where your groundworks jobs leak time and money

Describe the problem, how your gangs, plant and office work today, and which main contractors or housebuilders you work for. We will tell you what we would build and what we would not, and if a spreadsheet or your existing software would do the job, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →