Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Can We See Where Every Bundle Is on the Sewing Floor Without Walking the Lines?
Problems We Solve

How Can We See Where Every Bundle Is on the Sewing Floor Without Walking the Lines?

Clothing factories lose bundles between cutting, sewing and finishing. We build scan-based bundle tracking showing WIP by line, operation and order.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Bundles go missing and WIP piles up because the only record of where work is sits on paper tickets moving with the bundle. We build bundle tracking where each ticket is scanned as it changes hands, so the office can see WIP by line and operation, find a bundle without a search party, and spot a bottleneck while it is forming.

Bundle 312 is somewhere on the floor

The finishing supervisor has the order nearly complete except for one bundle of size 14 sleeves in navy. The ticket says it left cutting on Monday. Line 3 thinks it went to line 4 when they rebalanced. Line 4 says they never had it. Someone finds it at lunchtime under a table by the overlocker, half sewn.

Meanwhile, line 2 has a mountain of bodies waiting for collars, and nobody in the office knew until the line supervisor came up to complain.

Paper tickets travel, information does not

Bundle tickets do their job at the machine: the operator knows what the bundle is. The problem is that the ticket is the only record. The office, the planner and the other supervisors cannot see anything until someone walks the floor and counts.

  • Bundles move between lines when work is rebalanced, and nobody records it.
  • WIP is estimated by eye, not counted.
  • Subcontracted operations, such as embroidery, take bundles off site without a clear record.
  • Rework bundles loop back without being logged.
  • The planner learns about a bottleneck when a line runs out of work or is buried in it.

What invisible WIP does to an order

Lost bundles hold up entire orders at finishing, because a shipment cannot be packed with a size missing. Unbalanced lines mean some operators wait while others are overloaded, which hurts output and, where pay is piece rate, causes friction. The planner makes promises to brands based on guesses about how far along an order is, and the merchandiser finds out the truth late.

There is a quieter cost as well. When nobody can see WIP, the natural response is to cut more work and push it onto the floor so no line runs dry. That buries the lines in half-finished bundles, makes lost ones more likely, and ties up fabric in pieces that will not become garments for days.

How we track bundles

  1. Bundle tickets are printed at cutting with a barcode or QR code, holding order, style, colour, size, bundle number and quantity.
  2. Each time a bundle moves (issued to a line, passed to the next section, sent to an outside embroiderer, returned for rework) it is scanned with a phone or a cheap handheld scanner.
  3. Line supervisors can reassign bundles between lines with a scan, so rebalancing is recorded.
  4. A floor view shows WIP per line and per section, with bundles that have not moved for a set time highlighted.
  5. An order view shows how many pieces are at each stage, so the merchandiser can answer a brand's question without walking the floor.
  6. Finishing can see exactly which bundles are still missing for an order and where each one was last scanned.
QuestionAnswered byWith bundle scanning
Where is bundle 312?Walking the linesLast scan and location
Which line is overloaded?A supervisor complainingWIP per line on screen
How far along is this order?An estimatePieces at each stage
What is at the embroiderer?A notebookBundles scanned out and back

A floor you can see from the office

The planner sees a pile forming ahead of collar setting before it stops a line, and moves an operator. The finishing supervisor gets a list of what is missing for an order rather than a hunt. Bundles sent for embroidery come back or are chased by number. And when the brand asks how much of their order is sewn, the answer is a figure, not a feeling.

Sound like your floor?

  • Orders wait at finishing for a bundle that cannot be found.
  • WIP is estimated rather than counted.
  • Rebalancing between lines is not recorded.
  • You find out about bottlenecks when a line stops.
  • Merchandisers walk the floor to answer brand questions.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Do operators have to scan every operation?

Not necessarily. Many factories scan only when a bundle changes hands between sections or lines. Operation-level scanning is an option if you want it for piece-rate pay.

What hardware is needed?

A label printer at cutting and either phones or handheld scanners at hand-off points. We use standard equipment rather than anything specialised.

Can it work alongside our existing ERP?

Yes. Orders and cut quantities can come from the ERP, and completed quantities can go back to it.

What happens if someone forgets to scan?

The bundle shows its last known location, and a bundle that has not moved for longer than expected is flagged, so a missed scan is noticed rather than hidden.

Keep reading

More on Problems We Solve

Start here

Tell us where the paperwork slows your factory floor

Describe the brands you make for, how orders reach the cutting room, and how the lines are tracked and paid today. We will tell you what we would build and what we would leave alone, and if a change to the way you already work would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →