UK-registered +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Keep Track of Forty Restaurant Chairs Moving Through the Workshop at Once?
Problems We Solve

How Do We Keep Track of Forty Restaurant Chairs Moving Through the Workshop at Once?

Furniture makers running small-batch contract orders lose track of parts across stations. We build batch tracking for chairs, tables and fit-out runs.

Updated 2 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer: TL;DR

Small-batch contract runs get messy because a workshop used to one-off pieces suddenly has dozens of identical parts moving between machining, assembly, finishing and upholstery, tracked by counting piles. We build batch tracking where each batch and its components have a count at every stage, rejects and remakes are logged, and you see at a glance how close the order is to complete.

Counting legs on a Friday

A restaurant has ordered dining chairs and tables for its new site. It is the biggest order you have taken. Legs, rails, seat frames and backs are machined in batches, then assembled, sanded, finished and sent to your upholsterer for the seats. By the third week, parts are in piles all over the workshop. Somebody counts legs on Friday afternoon and gets a different number from the person who counted on Wednesday.

Two chairs failed inspection after finishing and need remaking. Nobody is quite sure whether the remade parts have been cut yet.

One-off habits, batch work

Makers used to commissions keep track of one piece in their head. Batch work breaks that, because it is many identical parts at different stages.

  • Parts are counted by eye, at irregular intervals.
  • Rejects and remakes are not recorded, so counts drift.
  • Different stages run at different speeds, and piles build up between them.
  • Parts at the upholsterer or finisher are out of sight.
  • The client asks how many are ready, and the answer is a guess.

What losing count costs

Short counts are discovered at assembly or, worse, when the delivery is loaded. Remakes are cut twice or not at all. Contract clients such as restaurants and hotels usually have an opening date, and missing it matters a great deal to them. And the workshop spends time counting and searching instead of making.

Batch tracking for contract runs

  1. The order is broken down into products, components and quantities, such as chairs, each with legs, rails, seat frames and backs.
  2. Stages are set up for each component: machining, assembly, sanding, finishing, upholstery, inspection, packing.
  3. At each stage, the person finishing a batch records the count passed on and any rejects, with a reason, on a tablet or phone.
  4. Rejects create remake tasks automatically, so they are cut and tracked like any other part.
  5. Outside stages, such as upholstery, record what has gone out and what has come back.
  6. A progress view shows how many of each product are complete, and where the rest are, with the delivery date alongside.
QuestionTodayWith batch tracking
How many chairs are ready?Count the pilesComplete count shown
Where are the rest?Walk aroundCount at each stage
Have remakes been cut?UnsureRemake tasks tracked
What is at the upholsterer?Phone themOut and back recorded

Batch work under control

You know how close the order is to finished at any moment, and can give the client a straight answer. Rejects are dealt with rather than forgotten. Piles between stages become visible, so you can move people to where the work is stuck. And after the order, the reject reasons show where the process could improve for the next contract.

Contract clients often want evidence of progress, such as photos of finished batches or a count before they release a stage payment. With counts recorded at every stage, that report is ready when they ask. It also makes it easier to deliver in phases, for example the tables first and the chairs a little later, because you know exactly which products are complete and packed.

Is a contract order stretching you?

  • You count parts by eye to know where an order stands.
  • Remakes have been missed or cut twice.
  • Piles build up between stages.
  • Parts at outside suppliers are hard to track.
  • Contract clients ask for progress and you have to guess.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly. A senior engineer reads every question.

Ask about your project

Do we need barcodes on every part?

No. Counting by batch at each stage is usually enough. Labels on batches or trolleys help, but are optional.

Can it handle a mix of one-off and batch work?

Yes. One-off commissions can stay in your normal flow while batch orders use stage counting.

What about quality checks?

Inspection can be a stage with its own pass and reject counts and reasons. What counts as a reject is your standard.

What affects the cost?

The number of products and stages, whether you want labels and whether it links to scheduling and delivery.

Keep reading

More on Problems We Solve

Start here

Tell us where the workshop paperwork gets in the way

Describe what you make, how many people are at the bench and what you run the business on today, even if it is a notebook and a spreadsheet. We will tell you what we would build and what we would leave alone, and if a smaller change would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate, with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →