How Do We Handle Clients Changing a Commissioned Piece After They Have Signed Off the Drawings?

Furniture clients change dimensions and finishes after sign-off, and the workshop builds the old version. We build change control for bespoke furniture.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Late changes to commissioned furniture cause trouble because they arrive by text or phone, are agreed in conversation, and never make it cleanly to the drawing, the cutting list, the price or the person at the bench. We build change control for each commission: every request is logged against the design version, priced and approved by the client, and only then passed to the workshop as a new version.

Can we make it a little deeper?

The drawings for the alcove cabinets were signed off a month ago. The carcasses are glued up. Then the client texts: could the shelves be adjustable rather than fixed, and could the top be 20mm deeper to match the skirting? You reply that you will look into it. On site, you mention it to the maker at the bench, who adjusts the shelves but does not hear about the top.

At fitting, the client asks why the top is not deeper. Later, they query the invoice because it includes a charge for the adjustable shelving they thought was a small change.

Changes travel by conversation

Bespoke work invites changes. Clients see the piece taking shape and have new ideas. That is part of the craft. The trouble is that the change process is informal.

  • Requests arrive by text, email, phone or in person on a site visit.
  • Changes are agreed in conversation without a written record of what and at what cost.
  • Drawings are updated, or not, depending on who took the request.
  • The person at the bench hears about changes second hand.
  • The cost and time impact of a change is rarely stated before it is made.

What informal changes cost

The piece gets built to the wrong version, and correcting it takes bench time and sometimes new timber. Invoices are disputed because the client thought a change was free. Lead times slip because a change added days that nobody accounted for. And the relationship suffers at the end of a job, when it should be at its best.

Change control for commissions

  1. Every commission has its approved design version: drawings, key dimensions, timber, finish and hardware.
  2. Change requests, however they arrive, are logged against the commission in one place, with the client's words and any photos.
  3. Each request is assessed: what changes in the drawing, the cutting list, materials, hours and delivery date. Parts already made that would be affected are noted.
  4. The client receives a short change note with the effect on price and date, and approves or declines it online.
  5. Approved changes create a new design version. The cutting list and workshop instructions update, and the maker sees what changed.
  6. The final invoice lists approved changes with their prices, so there are no surprises.
StepTodayWith change control
RequestText or chatLogged on the commission
ImpactGuessed or ignoredPrice, materials and date assessed
Client agreementVerbalApproved online
Workshop toldSecond handNew version with changes shown
InvoiceDisputedChanges listed with approval

Flexibility without the fallout

You can still say yes to changes, and most clients are happy to pay for them when they see the effect upfront. The bench always works from the current version. Disagreements at fitting and invoicing become rare, because every change has a record the client approved. You can also see how often changes happen and at what stage, which may lead you to build an extra review step into your design process.

Change control also protects the maker at the bench. They are not left guessing whether a comment made on a site visit was a decision or an idea, and they are not blamed for building what the drawing said. When a change arrives after parts are already cut, everyone can see what it costs in timber and time before the client decides, which is a fairer conversation for both sides.

Do changes trip you up?

  • Clients request changes by text after sign-off.
  • A piece has been built to an old version of the design.
  • Invoices for changes have been disputed.
  • The bench hears about changes second hand.
  • Changes push delivery dates without anyone telling the client.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Will clients feel this is too formal?

A short, friendly change note with a price and a button to approve usually feels professional rather than formal. It protects them as much as you.

Can small changes skip the process?

You can set a threshold below which changes are logged but not sent for approval.

Does it work with our drawing software?

Drawings can be attached as files from whatever you use. Where your CAD tool can export part lists, the cutting list can update from it.

What affects the cost?

How your designs are produced, whether it links to quoting and cutting lists and how clients currently approve designs.

Keep reading

More on Problems We Solve

Start here

Tell us where the workshop paperwork gets in the way

Describe what you make, how many people are at the bench and what you run the business on today, even if it is a notebook and a spreadsheet. We will tell you what we would build and what we would leave alone, and if a smaller change would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →