How Do We Line Up Trenching, Ducting and Electricians on Car Park Charger Projects?

Car park charger projects stall when trenching, ducting, bases and cabling crews arrive out of order. We build a sequenced plan each trade updates.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Commercial charger projects slip because civils and electrical work happen in a strict order, done by different crews, and the plan lives in one project manager's head and a spreadsheet. We build a sequenced project plan where each stage (survey, trenching, ducting, bases, reinstatement, cabling, mounting, commissioning) is marked done by the crew that did it, and the next crew and the site host are told automatically.

Electricians on site, trench still open

The electricians arrive on Monday to pull cables through the ducts. The groundworks subcontractor finished the trench but has not laid the duct on the far run, because the site host's car park was full on Friday. The concrete for the charger bases went in on Thursday and needs time before anything is mounted. The electricians leave, charge for the wasted day, and the project manager rebooks them for a week they are already busy.

Nobody made a mistake. Each crew was working to a plan that had changed without them hearing.

A strict order, managed loosely

Commercial charger work is a chain: survey and design, permits, marking out, trenching, ducting, bases, reinstatement, cable pulling, mounting, connection, commissioning, back-office setup. Each link is often a different crew or subcontractor. The site host controls access and wants bays closed for as short a time as possible. A change at one link ripples down the chain, and the only person who sees the whole chain is the project manager.

  • The programme is a spreadsheet updated when the project manager has time.
  • Crews hear about changes by phone, or do not.
  • Site access windows and bay closures are agreed by email.
  • Completion of each stage is not recorded, only assumed.
  • Photos of buried work (duct routes, depths as built) are on crew phones.

What wasted days cost

Crews charge for wasted visits, and good subcontractors become less willing to fit you in. Site hosts get frustrated when bays stay closed longer than agreed. Delays push commissioning and revenue start dates back. And missing as-built photos of buried ducts become a real problem the first time someone needs to know where a cable runs.

Car parks are live spaces. Every day a bay stays coned off is a day the site host's customers or staff park somewhere else, and retail and hotel hosts notice. Sequencing problems on your side turn directly into complaints on theirs.

The sequenced plan we build

  1. Each project is set up from a template of stages you define, with dependencies between them and typical durations your project managers set.
  2. Each stage is assigned to a crew or subcontractor, who get a simple phone view of their stages across your projects.
  3. When a crew finishes a stage, they mark it done with the photos your process requires. Buried work has required as-built photos before it can be closed.
  4. Completing or delaying a stage updates the dates of the stages after it, and tells the crews affected and the site host contact.
  5. Access windows and bay closures agreed with the site host are part of the plan, so crews see them before they travel.
  6. A weekly view across projects shows what is on track, what is blocked and why.
MomentTodayWith the plan
Stage finishedPhone call, maybeMarked done with photos
Stage delayedNext crew finds out on siteDates move, crews told
Site accessEmail agreementShown on each crew's view
Buried work recordCrew phonesRequired photos on the stage
Portfolio viewProject manager's headWeekly status across projects

Design, depths and methods remain your engineers' decisions. The plan records who does what, in what order, and when it is done.

Crews who arrive when they can work

Each crew sees their own next stages and hears about delays before they set off. The project manager spends time solving blockers rather than ringing round. Site hosts get fewer surprises. And every project ends with a record of what was buried where, which the maintenance team will be glad of.

The site host also gets something useful: a clear picture of when bays will close and reopen, which they can pass to their own staff and customers instead of discovering cones on the morning.

Signs your projects need sequencing

  • Crews have arrived to find the previous stage unfinished.
  • The programme is only up to date in the project manager's head.
  • Site hosts complain about bays closed longer than agreed.
  • As-built photos of duct routes are hard to find.
  • Subcontractors charge for wasted visits.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Is this a full project management system?

It is a focused plan for the stages of charger projects. If you already use project software, we can build the crew views and notifications around it.

Do subcontractors need logins?

They get a simple phone view of their own stages, with no access to your other projects or pricing.

Can the site host see progress?

If you want. A read-only project page for the host is a common addition.

What affects the cost?

The number of stage templates, how many crews and subcontractors need access, and which systems the plan should update.

Keep reading

More on Problems We Solve

Start here

Tell us where your charger operations get stuck

Describe the sites and chargers you look after, the back-office or management platform they report to, and how work reaches your engineers today. We will tell you what we would build and what we would leave alone, and if your existing platform already does it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →