Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Stop For Sale Boards Going Up Late, Staying Up Too Long or Going to the Wrong House?
Problems We Solve

How Do We Stop For Sale Boards Going Up Late, Staying Up Too Long or Going to the Wrong House?

Estate agent board orders are sent by email and forgotten, so boards go up late or stay too long. We build board ordering triggered by status in your CRM.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Board orders depend on a negotiator remembering to email the board contractor at each status change, so boards go up late, slips are not added and old boards stay up for months. We build board ordering that is triggered by status changes in your CRM, checks the vendor's consent, sends a clear order to your contractor and tracks each board until it is collected.

A sold board that never went up

The sale was agreed three weeks ago. The vendor asks why the board still says for sale. The negotiator meant to order the sold slip but forgot. Down the road, a board for a house that completed in the spring is still up, advertising a sale that finished months ago, and the new owners have rung twice to ask for it to be removed.

Your board contractor is doing exactly what they were asked. The problem is what they were not asked.

Why board ordering slips

Board orders are small, frequent tasks tied to status changes: instructed, sold subject to contract, withdrawn, completed. Each one is an email or a phone call to the contractor, and they are the kind of task that gets forgotten on a busy day. There is usually no list of which boards are up where, so nobody can check.

Some vendors do not want a board, and some locations have rules about boards, which your business will have its own approach to. Those preferences need to be recorded and respected.

Status changeBoard actionUsual trigger
Instruction goes livePut up for sale boardNegotiator remembers
Sale agreedAdd sold slip, if vendor agreesNegotiator remembers
WithdrawnRemove boardOften forgotten
CompletedCollect boardOften forgotten

What forgotten boards cost

Boards are some of the cheapest local marketing you have, and a late board loses its early days. Sold slips signal activity to neighbours who might be thinking of selling. Boards left up after completion annoy new owners, and a board still outside a withdrawn property can cause trouble with the vendor. Unnecessary board visits and lost boards cost money too.

Boards are also a visible sign of how organised your office is. Neighbours, potential vendors and competitors all see them. A street with your current boards, correctly slipped, tells a story of an active agent. A street with faded boards from sales that ended months ago tells a different one.

How we automate board orders

  1. Status triggers: when a property's status changes in your CRM, the matching board action is prepared automatically.
  2. Consent check: the vendor's board preference, recorded at instruction, is checked first. No board is ordered where the vendor declined.
  3. Order to contractor: a clear order goes to your board contractor with address, board type, position notes and any access details, by email or through their ordering system if it has an API.
  4. Board register: every board is recorded with its status, from ordered to up to collected, and the contractor's confirmations update it.
  5. Stale board alerts: boards still up after completion or withdrawal, beyond a period you set, are flagged to the branch.

Boards that follow the sale

Boards go up when listings go live and slips go on when sales are agreed, without anyone remembering. Old boards come down on time. The branch can see every board it has out, which is also a useful map of activity for canvassing.

The contractor's invoices also become easy to check. Each board visit on the invoice can be matched to an order in the register, so charges for boards that were never ordered, or collections that never happened, stand out. Vendors who declined a board are protected from one going up by mistake, which is exactly the kind of error that damages trust at the start of an instruction.

Is this happening in your patch?

  • Board orders are emailed to the contractor by hand.
  • Sold slips are sometimes forgotten.
  • New owners have asked you to remove an old board.
  • You have no list of which boards are up where.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Can it work with our board contractor?

Yes. Most accept orders by email, and some have online ordering we can connect to. The contractor does not need to change how they work.

What about local rules on boards?

Your business decides how to follow any local rules, and we can add a check for particular areas or streets you flag.

Does our CRM need an API?

It helps. If the CRM can send status changes or be read on a schedule, orders can be triggered automatically. Otherwise a one-click order from a list works.

Can it track board stock and costs?

It can record each order and collection, which gives you the basis for checking contractor invoices.

Keep reading

More on Problems We Solve

Start here

Tell us about the admin behind your branch

Describe the task, who does it now and which systems or bits of paper are involved. We will tell you what we would build, what should stay with your team, and if a small change to your current setup would be enough, we will say that instead.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →