How Do We Stop Doing Extra Design Work for Free Every Time the Architect Changes the Scheme?

Engineering consultancy additional services go unbilled when scope changes are never logged. We build a change log that records instructions and extra hours.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Extra design work goes unbilled because scope changes arrive as casual requests and nobody records them against the appointment at the time. We build a change log where engineers flag possible additional services in a few clicks, hours are booked against each change, and directors get a list of changes to raise with the client, with the evidence already attached. Whether a change is chargeable is still your call and your appointment's.

Another small change, another afternoon of redesign

The architect emails on Tuesday: the client wants to move the plant room to the roof. Could you just check the steelwork can take it? Your engineer checks. It cannot, not without new beams, a revised bracing layout and a fresh look at the foundations below the core. Two days later the structure is redesigned and reissued. Nobody mentioned fees because it felt like part of keeping the project moving.

Multiply that by every scheme change over a year and a practice is giving away a real share of its design effort. Each change felt too small to argue about when it arrived. Together they are the difference between a job that paid and one that did not.

Why extra work slips through

  • Changes arrive informally, in emails and design team meetings, not as instructions.
  • The engineer doing the work is focused on the design, not on the appointment terms.
  • Hours for the change are booked to the same job code as the base scope, so they disappear into it.
  • By the time a director reviews the job, nobody can separate what the change cost.
  • Raising fees late feels confrontational, so it is often dropped.

The underlying problem is timing. The best moment to note that something may be an additional service is the moment it is requested, and that is exactly when nobody has time to think about it.

What unbilled changes cost

What happens todayEffect
Change done without a recordFee absorbed, and no evidence if you ask later
Hours mixed with base scopeStage looks overrun with no explanation
Fee raised months laterClient disputes it, relationship strained
No pattern visibleSame client or architect keeps generating free work

There is also a morale cost. Engineers who spend evenings redesigning for changes that the practice never charges for notice, and they learn that the extra effort is not valued.

How we build a scope change log

  1. We add a 'possible change' button to the places engineers already work: the RFI log, the project mailbox, or a simple form on a phone.
  2. Flagging a change takes the triggering email or meeting note, a one-line description and the drawings affected.
  3. Each change gets its own time code, so hours spent on it are recorded separately from the base scope.
  4. The project director reviews new changes weekly and marks each as within scope, chargeable, or to discuss.
  5. For chargeable changes, the tool drafts a short fee letter or additional services notice from your template, with the hours so far and the instruction attached.
  6. Changes and their status are summarised per project, so fee discussions happen with evidence.
  7. Across projects, a report shows which clients and design teams generate the most change, useful when pricing the next job with them.

The decision about whether something is inside the appointment stays with the director and the appointment itself. The tool's job is to make sure the question gets asked while the facts are fresh.

After a few months of logging changes

Engineers flag a change in less time than it takes to complain about it. Directors see a short weekly list and can raise the fee conversation early, often before the redesign starts, which is when clients are most willing to agree.

Even the changes you decide not to charge for are now visible. That is useful goodwill to point to, and it feeds straight into how you price the next proposal.

Does this happen in your practice?

  • Scheme changes are redesigned without anyone mentioning fees.
  • Time for changes is booked to the base job code.
  • Additional fees are raised months after the work.
  • Some clients or architects always seem to cost more than the fee.
  • Engineers do not know what the appointment actually covers.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Will this tell us whether a change is chargeable?

No. That depends on your appointment and your judgement. The tool records the change and the time spent so the decision can be made with facts.

Does it work with our timesheet system?

Usually yes. Each change becomes a sub-code in your existing timesheet or accounts system where it allows that, or a tag we track alongside it.

Will clients see the change log?

Only if you choose to share it. Most practices keep the log internal and send formal letters from it.

What affects the cost?

Which systems we need to connect to, how you record time today, and how the fee letters need to look.

Keep reading

More on Problems We Solve

Start here

Tell us where your engineering practice loses time

Describe the process, the software your engineers and office team already use, and where it stalls. We will tell you what we would build and what we would leave alone, and if a smaller change would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →