Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Can an Energy Consultancy Keep Up When Clients Open, Close and Move Sites?
Problems We Solve

How Can an Energy Consultancy Keep Up When Clients Open, Close and Move Sites?

Energy consultancies hear about client site closures and moves too late to handle meters properly. We build a site change process from notice to final bill.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Multi-site clients open new premises, close old ones and move, and each change involves meters, contracts, final reads, suppliers and sometimes commission. Consultancies often hear late and handle each change from scratch. We build a site change process that captures the change from the client, creates the right tasks for each meter, tracks supplier responses and closes only when the final bill or first bill is in.

"By the way, we moved out of the Bristol unit last month"

In a routine call, a client mentions that they left one of their units last month and opened a new one across town. Nobody told the supplier about the move out. No final read was taken on the day they left. The new unit is on whatever supply the previous occupier left in place, and nobody has checked what that is.

Now your account manager has to reconstruct the move date, find a read from around that day, contact the supplier about the old unit and find out what is happening at the new one, while the client wonders why this was not handled.

Why site changes are handled badly

Site changes happen at the client's pace, driven by leases and operations, and energy is rarely the first thing on the client's mind.

  • Clients do not think to tell their energy consultant until after the event.
  • Each change involves several steps: move-out read, supplier notification, final bill, and at the new site, supply and contract checks.
  • Steps involve different parties and take weeks to complete.
  • Nobody has a checklist, so steps are missed.
  • Commission and contract records are not updated when meters leave.

The cost of a missed step

A missing move-out read can leave the client disputing bills for a period after they left. A new site left on whatever supply was in place may be paying rates nobody chose. Final bills that never arrive, or arrive after months, complicate the client's accounts.

For the consultancy, untracked changes mean wrong contract records, unexpected commission clawbacks and hours of reconstruction. And clients remember that their consultant did not catch it.

A site change process from notice to final bill

We build a site change process into your client and meter records.

  1. Clients report changes through a simple form in their portal or by email: site, type of change, dates and contacts. Account managers can log changes from calls in the same way.
  2. Each change creates a set of tasks from a template for that type: moving out, moving in, closing, opening.
  3. Move-out tasks include collecting a read on the day, with a photo if possible, notifying the supplier with the read and the date, and expecting a final bill.
  4. Move-in tasks include identifying the meters at the new site, checking what supply and terms are in place, and flagging the site for your team to review.
  5. Tasks are tracked with owners and due dates. Supplier responses are linked to the change.
  6. The change closes when the final bill for the old site and the first bill for the new site have been received and checked. Contract, meter and commission records are updated along the way.
StepHandled ad hocSite change process
Hearing about the changeIn passing, lateReported by form or logged from a call
Move-out readOften missedTask on the day, with photo
Supplier notifiedWhen someone remembersTask with date and read
New site supplyUncheckedFlagged for review
Closing the changeNever formallyWhen final and first bills are checked

The process organises the steps. Advice to the client about supply at a new site remains your consultancy's job.

Moves that are handled before they are forgotten

When a client plans a move, they report it in the portal a few weeks ahead. The move-out read task reminds the site manager on the day. The supplier is notified with the read. The new site is reviewed before the client has unpacked. A few weeks later, the final bill arrives and is checked against the read, and the change is closed.

Contract and commission records stay accurate, and the client sees a consultancy that looks after the details.

Are site changes catching you out?

  • You hear about site moves after they happen.
  • Move-out reads are often missing.
  • New sites have stayed on unchecked supply.
  • Final bills arrive late or never.
  • Contract records are not updated when meters leave.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

How do clients report changes?

Through a form in a client portal, by email to a dedicated address, or through the account manager. All routes create the same change record.

Can the templates be different for different clients?

Yes. You can adjust task templates for clients with particular arrangements.

Does it notify suppliers automatically?

It prepares notifications for approval, or creates a task where a supplier requires a portal submission.

Does it link to commission tracking?

Yes. Meters leaving contracts update the commission ledger and any clawback exposure.

Keep reading

More on Problems We Solve

Start here

Tell us where your team loses time today

Describe the step that slows your consultancy down, the systems involved and who does the work now. We will tell you what we would build, and if a smaller change to your current tools would do the job, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →