Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. Why Do Two of Our Estimators Price the Same Rewire So Differently?
Problems We Solve

Why Do Two of Our Estimators Price the Same Rewire So Differently?

Electricians price rewires from memory, so quotes vary and margins leak. We build a room-by-room rewire quote builder using your own rates and allowances.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Rewire quotes vary because each estimator carries their own mental model of points per room, access allowances and materials. We build a room-by-room quote builder that uses your own rates, captures the survey on a tablet, applies consistent allowances for things like floor types and occupancy, and produces a clear quote your estimator approves.

Same house, two different numbers

A three-bed semi, full rewire, customers still living in it. One estimator walks round, counts roughly, and comes back with a figure. Another, on a similar house the week before, priced a good chunk higher. Both are experienced. Both are sure they are right. One of them either lost the job or will lose money doing it.

The owner looks at the two quotes and can't tell which assumptions made the difference.

Where the variation comes from

A rewire price depends on a long list of things that are easy to judge differently: points per room, floor coverings to lift, whether the house is occupied, plaster condition, loft access, making good, whether the board moves, and how many days of labour it all adds up to. Most estimators work from memory and a notepad, then a total goes into a quote template.

The quote template records the answer, not the working, so nobody can compare how two quotes were built.

FactorCommonly judged differently
Points per roomCounted, or assumed from room type
Occupied propertyExtra days allowed, or not
Floor typeCarpet, laminate, solid, each adds different time
Making goodIncluded, excluded, or vague
AccessLoft and under-floor assumed easy

Here is how it plays out on an ordinary Tuesday. One estimator counts every double socket and every light point on a pad. The other walks round, sees a standard three-bed layout and prices from a mental template. Both add a margin for 'the unknowns'. Neither writes down whether the customer will be living in the house during the work, which is often the single biggest swing in how many days the job takes.

The margin you can't see

Under-priced rewires run over, and your team spends days you aren't paid for. Over-priced ones go to someone else. Customers comparing quotes see vague line items and ring with questions. And when the job does overrun, you can't tell whether the estimate was wrong or the job was unusual, so nothing improves.

It also affects how the team feels about the work. Electricians who are regularly asked to finish an under-priced rewire in fewer days than it needs start cutting their breaks or leaving making good for later, and neither is good for them or for the customer.

A rewire builder that shows its working

  1. Rate library: your labour rates, materials allowances per point type and standard items are held in one place that the owner controls.
  2. Room survey: on a tablet, the estimator walks the house room by room, entering points, floor type and access notes, with photos.
  3. Allowances: consistent adjustments for occupancy, floor types, plaster condition and making good are applied from your rules, and can be overridden with a reason.
  4. Quote output: a clear quote grouped by room and stage (first fix, second fix, making good, certification), with exclusions stated in your wording.
  5. Comparison: completed jobs can be compared with their estimate, day by day, so allowances can be adjusted from real results rather than feelings.
  6. Hand-off: an accepted quote becomes a job in Simpro or your job software with the room list as the work plan.

Quotes you can explain

Any estimator's quote can be read and checked by another. The owner can see why a price is what it is. Customers get a breakdown they understand. And over time, your allowances get more accurate because you can see where jobs went over.

It also makes it easier to bring on a new estimator. Instead of shadowing the owner for months to absorb his instincts, a new person works through the same library and allowances, and the owner can check their first quotes line by line against the rules everyone else uses.

Is your rewire pricing like this?

  • Estimators price rewires from memory.
  • Similar houses get noticeably different quotes.
  • Rewires regularly overrun the days allowed.
  • Customers ask what exactly is included.
  • You can't see how a past quote was worked out.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Will this set our prices?

No. You set the rates and allowances. The builder applies them consistently and shows its working.

Can estimators still use their judgement?

Yes. Any allowance can be overridden, with a short reason so the owner can see why.

Does it work for commercial rewires?

The same approach works, with a different library of items. We usually start with whichever work you quote most.

Do we need new job software?

No. Accepted quotes are pushed into the job software you use where it has an API or import.

Keep reading

More on Problems We Solve

Start here

Tell us which electrical jobs create the most admin

Describe the work, the software you run and where the paperwork piles up. We will tell you what we would build, what stays with your electricians and supervisor, and if an off-the-shelf tool you already pay for could do it, we will say that instead.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →