How Do We Make Sure Extras Found on Site Actually End Up on the Invoice?

Electricians add sockets or sort a hidden junction box on the customer's say-so, then never bill it. We build phone variations with approval before work.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Extras go unbilled because they are agreed in a conversation on site and never written down anywhere the office sees. We build a quick variation step on the electrician's phone that records the extra, prices it from your rates, gets the customer's approval on the spot, and adds it to the job so it lands on the invoice.

'While you're here, could you...'

Halfway through a kitchen rewire, the customer asks for two more sockets by the island and an outside light. The electrician says fine, it's a small job, does it, and moves on. Under the floor he also finds a junction box that needs sorting before he can carry on. None of it is written down.

The invoice goes out at the quoted price. When the office asks later, the electrician can't remember exactly what he added, and it feels awkward to bill the customer three weeks after the event.

Why extras disappear

Electricians are good at the work and generally dislike the paperwork. Agreeing an extra in the moment feels like good service, and stopping to write a price feels like haggling. The office only sees the original quote. Nobody makes the link unless the electrician remembers to mention it at the end of a long day.

There's also a genuine problem that some extras aren't optional: things uncovered during the work that have to be put right. Those need to be explained to the customer before the work is done, not on the invoice.

Type of extraHow it's usually handled
Customer adds pointsAgreed verbally, not priced
Hidden defect foundFixed, sometimes explained, rarely priced up front
Access worse than expectedAbsorbed as extra time
Materials upgrade requestedBought, sometimes not recharged

The office often compounds it. Seeing a job took longer than planned, they assume the electrician was slow, not that he fitted two extra circuits. The information that would explain the overrun never reached anyone who could bill it.

Where the margin goes

Unbilled extras come straight off your margin. Billing them late causes disputes because the customer remembers it as a favour. Hidden defects explained only on the invoice feel like an ambush. And your quoting never improves, because the record shows the job at the original price.

Unbilled extras also distort the picture of which jobs are profitable. A kitchen rewire that looks like it ran two days over might have been a well-run job with two days of extra work that nobody invoiced. Without that record, the next kitchen gets priced with extra days added, and you lose it to a cheaper quote.

The variation step we build

  1. Quick capture: on their phone, the electrician adds a variation with a short description, photo and the items or time involved.
  2. Pricing: the extra is priced from your standard rates, with the option to send it to the office for a price if it's unusual.
  3. Customer approval: the customer sees the description and price on the electrician's phone or by text, and approves with a tap. Nothing is done until they have.
  4. Job update: approved variations are added to the job in your job software, so the office sees them straight away.
  5. Invoice: the final invoice includes approved variations as separate lines, each with its approval record.
  6. Review: the owner can see variations by job type, which shows where original quotes keep missing things.

Extras that pay for themselves

Customers agree prices before work, so invoices don't surprise them. Electricians stop feeling awkward, because the system does the asking. The office invoices from a complete record. And patterns in variations tell you what to add to your quotes next time.

It also helps with commercial work, where variations need a written instruction. The same capture step records who asked for the change and when, which is the record a main contractor's QS will want to see.

Is this happening on your jobs?

  • Extras are agreed on site and not written down.
  • Invoices go out at the quoted price even when more was done.
  • Customers dispute extras that appear on the invoice.
  • Hidden defects are fixed before the customer has agreed a price.
  • You can't tell how often jobs grow beyond the quote.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Won't customers find it off-putting?

A clear price before the work is usually better received than a surprise on the invoice. The wording of the approval message is yours.

Does it work with Xero or QuickBooks?

Yes. Approved variations are added to the job and flow to the invoice in your accounts software through its API.

What if the extra can't be priced on the spot?

The electrician sends it to the office, which prices it and sends the approval to the customer directly.

Do electricians need to learn a new app?

If you already use job software on phones, we add the variation step to it where possible. If not, it is a simple web page.

Keep reading

More on Problems We Solve

Start here

Tell us which part of your electrical work leaks time or money

Describe the jobs, how they are scheduled and billed now, and which software you use. We will tell you what we would build and what should stay a human decision. If a setting in your current software would do the job, we will point you to it.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →