Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Stop Quoting With Cable and Material Prices From Months Ago?
Problems We Solve

How Do We Stop Quoting With Cable and Material Prices From Months Ago?

Electricians lose margin when twin and earth and SWA cost more at the counter than in the template. We build a wholesaler cost feed with stale-job warnings.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Material prices in electrical quotes go stale because the quote template holds prices someone typed in once, while cable and copper-based items move often. We build a price list that updates from your wholesalers' price files or account data, flags quotes built on old prices, and warns before an accepted quote is ordered at a loss.

The quote was right in spring

You quoted a full rewire in March. The customer accepted in June. When you order the twin and earth, the price at the counter is noticeably higher than the figure in your template, and the same is true of the SWA and a few other lines. The labour's the same; the margin on materials has gone.

Nobody's fault exactly. The template prices were entered last year and updated when someone had time, which was never.

Why your prices lag the counter

Your wholesalers change prices regularly, and cable in particular moves with copper. Your quoting spreadsheet or job software holds a fixed list. Updating it by hand means going line by line through hundreds of items, so it happens rarely, and different estimators patch it in different ways.

Quote validity periods help in principle, but only if someone checks the prices when an old quote is accepted.

Where prices sitHow often updated
Quote template or spreadsheetWhen someone remembers
Job software price listImported once, then drifts
Wholesaler trade counterChanges often
Wholesaler account portalCurrent, but not connected
Estimator's memoryVaries by estimator

Different job types feel it differently. A domestic rewire uses a lot of twin and earth. A commercial job might use SWA, data cable and containment, each on its own price cycle. A quote template that has one old price per item hides the fact that some lines are far more exposed to price changes than others.

The margin that disappears quietly

Every job quoted at old prices and bought at new ones loses money on materials. It doesn't show as a loss on any single day, just as a thinner year. Estimators lose confidence in the price list and start adding their own padding, which makes quotes uncompetitive in the other direction.

Long jobs are the most exposed. A commercial fit-out quoted in the autumn and started in the spring can see material prices move between tender and order, and if nobody checks at the point of order, the difference comes out of the margin.

The price-aware quoting we build

  1. Price feed: we load your wholesalers' price files, or read your account prices where the wholesaler provides a download or API, on a regular schedule.
  2. Product matching: your quote items are matched to wholesaler product codes once, with the office confirming any that are unclear.
  3. Price updates: your price list updates from the feed, and changes above a threshold you set are listed for the owner to see.
  4. Quote check: every quote shows the date its prices were taken. When an old quote is accepted, it is re-priced in the background and any material difference is flagged before you confirm the job.
  5. Order compare: when you order, the order price is compared with the quoted price per line, so you can see where margin moved.
  6. Estimator view: estimators see the current price and the last few changes on the lines that move most.

How you handle price changes with customers is your decision and your terms. The system tells you when it matters.

Quotes that match the counter

Your price list stays current without a spare afternoon. Old quotes are checked before you commit. Estimators trust the numbers, so they stop padding. And the owner can see when a price change is worth a conversation with the customer.

It also makes conversations with customers simpler. If a quote is accepted long after it was issued and material prices have moved, you can show the customer which lines changed and by how much, rather than asking for more money on a feeling.

Is your pricing like this?

  • Material prices in your template are months old.
  • Cable costs at order time are higher than quoted.
  • Old quotes are accepted and ordered without re-checking.
  • Estimators keep their own price notes.
  • You can't see which lines have moved most.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Which wholesalers can you connect to?

It depends on what they offer: price files, account downloads or APIs. We check with yours before promising a feed.

Will it re-price quotes automatically?

It re-prices in the background and flags differences. Whether to change a quote is your decision.

Does it work with our job software?

We update price lists in job software such as Simpro where it has an import or API, or run the quoting ourselves if not.

What if we buy from several wholesalers?

Each is loaded separately, and you choose which price to quote from per item.

Keep reading

More on Problems We Solve

Start here

Tell us which electrical admin job you would hand over first

Describe how the work happens now, which tools and suppliers are involved and who ends up doing the admin. We will tell you what we would build and what should stay a human call. If a smaller change would fix it, we will tell you that instead.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →