How Do We Plan Which Fermenter Each Brew Goes Into Without the Whiteboard Getting It Wrong?

Brewery tank planning on a whiteboard double-books fermenters and brites. We build a vessel schedule tied to recipes, turnaround times and packaging dates.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Fermenter scheduling fails because the whiteboard shows today, not the next three weeks, and it cannot see packaging or cleaning. We build a vessel schedule that knows each beer's fermentation and conditioning time, each tank's size and the packaging slots, so brew dates are planned against tanks that will actually be free.

Two brews, one empty tank

The whiteboard in the brewhouse says FV3 is free on Thursday. The head brewer booked a brew for Thursday. Then the lager in FV3 needed another week of conditioning, the brite tank was full because the canning slot moved, and Thursday's wort had nowhere to go. You either delay the brew or crash a beer that was not ready.

The board is a snapshot. It shows what is in each vessel and a rough date, written in a hurry and rubbed out by a sleeve.

The chain nobody can see on a board

A fermenter is free only when the beer in it has moved on, and it moves on only when a brite tank or a packaging slot is ready for it. Each beer has its own timings: a pale ale might be ready in a couple of weeks, a lager takes much longer. Cleaning and CIP take time between fills. Change any link and every date after it moves.

  • Fermentation and conditioning times differ by recipe.
  • Tank sizes limit which brews can go where, and double brews need a big vessel.
  • Brite tanks and packaging slots gate when a fermenter empties.
  • Mobile canning dates are booked weeks ahead and do not flex.
  • The board has no memory, so nobody sees the knock-on.

The cost of a bad tank plan

Brews get pushed back, which pushes back sales you promised to the trade. Beer is packaged early or late to free a vessel. The head brewer spends evenings redoing the plan in their head. Growth is harder too, because you cannot tell whether another fermenter would help or whether the bottleneck is really the brite tanks.

The trade feels it last. A pub that was promised the seasonal for a certain weekend gets it a week late, or gets a different beer, and your sales team spends the week apologising for a planning problem that started on a whiteboard.

The vessel schedule we build

  1. Every vessel set up with its capacity and type: fermenters, unitanks, brites, conditioning tanks.
  2. Each recipe holds its typical fermentation, conditioning and cleaning times, which you can adjust per batch.
  3. Planned brews are dragged onto a timeline and the tool shows which vessels will be free and big enough.
  4. Packaging slots, in-house or mobile canning, are on the same timeline, so a brite cannot be planned full on a canning day with nowhere to go.
  5. When a batch runs long, you update one date and the knock-on to later brews is highlighted at once.
  6. A tablet view in the brewhouse replaces the whiteboard, showing today and the next few weeks.
  7. If your brewery software already has a tank view, we build on its data and add only the planning it lacks.
QuestionWhiteboardVessel schedule
What is in FV3?YesYes
When will FV3 be free?A guessCalculated from the batch
Can we brew a double on the 12th?Ask the head brewerShown directly
What moves if the lager runs long?Nobody knowsHighlighted
Is the bottleneck fermenters or brites?Argued aboutVisible over months

Planning brews with confidence

The head brewer sets brew dates knowing a tank will be free. Sales can see when a beer will be packaged. When something runs long, the whole team sees what moves and decides together. After a few months you have a record of how full each vessel really was, which is what you need before buying another one.

Recognise this?

  • The tank plan lives on a whiteboard or in one person's head.
  • Brews have been delayed because a vessel was not free.
  • Beer gets packaged early to make room.
  • Canning dates and tank plans are kept in different places.
  • You are not sure whether you need more fermenters or more brites.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does it control the tanks?

No. It plans which vessel is used when. Temperature control stays with your existing controllers.

Can we still override the plan?

Always. The schedule suggests and warns; the head brewer decides.

What if our timings vary a lot between batches?

You set the typical time per recipe and adjust each batch as it goes. The plan updates from the actual dates.

Will it tell us whether to buy another fermenter?

It shows how full each vessel type has been over time. The decision is yours, but it will be based on a record rather than a feeling.

Keep reading

More on Problems We Solve

Start here

Tell us where the brewery loses track

Describe the problem, the brewery software and spreadsheets you use, and roughly how many trade accounts and vessels you run. We will tell you what we would build and what we would leave alone, and if a setting in the system you already pay for would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →