Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Keep Track of Section 20 Consultations Across Every Block?
Problems We Solve

How Do We Keep Track of Section 20 Consultations Across Every Block?

Block managers juggle section 20 notices, observation periods and estimates in spreadsheets. We build a consultation tracker so no stage is missed or muddled.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Section 20 consultations run for weeks and several can be live at once across a portfolio, so dates, notices and leaseholder observations get lost in inboxes. We build a tracker that holds each consultation's stages as your procedure and advisers define them, reminds the property manager before each date, logs every notice sent and every observation received, and gives directors a clear status.

Four consultations, four different spreadsheets

Roof works on one block, a lift replacement on another, a long-term cleaning contract on a third, and a redecoration project that the directors keep changing their minds about. Each one needs notices issued, an observation period observed, estimates gathered and responses recorded.

Each property manager tracks theirs differently. One uses a spreadsheet, one uses calendar reminders, one relies on memory and a paper file. When a property manager is off sick, nobody else can tell which stage a consultation has reached or when the next notice is due.

Why it is so easy to lose the thread

A consultation is a sequence of dated events spread across email, post, contractor quotes and leaseholder replies. None of the usual tools holds that sequence in one place. The block management system knows about the leaseholders and the money, but usually not about where a particular consultation stands.

Observations from leaseholders arrive by email, by letter and sometimes by phone. They need recording and responding to, and they are the first thing to go missing when someone is busy.

What a muddled consultation costs

We will not tell you what the law requires; your advisers do that. What we can say is what disorder looks like in practice: a notice sent to the wrong address list, a date calculated from the wrong day, an observation that never got a reply, a director asking for a status nobody can give.

Each of those means rework, awkward conversations with leaseholders and, where works are delayed, contractors waiting and prices moving.

The consultation tracker we build

We build a tracker that treats each consultation as a record with stages, dates, documents and correspondence attached. The stages are set up from your procedure, as agreed with your advisers, so the system follows your process rather than inventing one.

  1. Consultation record: property manager opens a consultation against a block, chooses the type of works or agreement, and the stage template for that type is applied.
  2. Distribution list: leaseholder names and service addresses are pulled from your block management system at the time of each notice, and the list used is saved with the notice.
  3. Date reminders: each stage has a due date, and the property manager and a backup are reminded ahead of it.
  4. Observation log: a dedicated mailbox per consultation, or a tag on your shared inbox, feeds replies into the record. Letters can be scanned in. Each observation shows whether it has been answered.
  5. Document store: notices, estimates, specifications and responses are filed against the stage they belong to.
  6. Status view: a portfolio screen shows every live consultation and its current stage, and a simple summary can be shared with directors.
Usual problemHow the tracker handles it
Unclear which stage a consultation is atOne status per consultation, visible to the whole team
Wrong or outdated address listAddresses pulled fresh for each notice and saved with it
Observation unansweredEach one logged with an open or answered state
Property manager absentBackup is named and reminded as well

What property managers notice day to day

Nobody has to rebuild a timeline from email threads. Opening a consultation shows what has been sent, to whom, what has come back and what is due next. When directors ask where the roof project has got to, the property manager can answer from the screen.

When a property manager leaves or goes on holiday, their consultations carry on under someone else without a scramble.

Signs you need this

  • Section 20 dates are tracked in personal spreadsheets or calendars.
  • Leaseholder observations have gone unanswered because the email was missed.
  • Nobody but the property manager knows where a consultation stands.
  • Several consultations are live at once across the portfolio.
  • Directors regularly ask for status updates you have to piece together.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does the system tell us what the law requires?

No. It follows the stages and time periods you configure with your own advisers. It is a record and reminder tool, not legal advice.

Can it send the notices itself?

It can generate them from your templates and send by email, with post queued for printing. A person approves each notice before it goes.

Will it connect to our block management system?

We read leaseholder and address data from it through its API or exports. Where writing back notes is possible, we can do that too.

What happens to consultations already in progress?

We import them at their current stage with the documents you have, so the tracker starts from where you actually are.

Keep reading

More on Problems We Solve

Start here

Tell us where your block management admin gets stuck

Describe the task, how many blocks it touches and which system you run them on. We will tell you what we would automate, what should stay with your property managers, and if a smaller change to your current setup would fix it, we will say that instead.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →