Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Keep Track of Leaseholder Requests for Alterations, Pets and Subletting Consent?
Problems We Solve

How Do We Keep Track of Leaseholder Requests for Alterations, Pets and Subletting Consent?

Block managers lose track of licence to alter, pet and subletting consent requests. We build a consent tracker with forms, fees, documents and deadlines.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Leaseholder requests for consent, such as alterations, flooring changes, pets or subletting, arrive by email with missing information and then bounce between the leaseholder, the freeholder or directors, surveyors and solicitors. We build a request tracker with forms that ask for the right documents up front, fee collection, a clear approval route per block and a record of what was consented and on what conditions, while decisions stay with the people entitled to make them.

A new kitchen, a dog and a subletting question

In the same week, one leaseholder wants to knock through a kitchen wall, another wants to replace carpet with wooden floors, a third asks if they can keep a dog and a fourth wants to let their flat on a short-term basis. Each one emails the property manager. Each needs something different: plans, a surveyor's view, the freeholder's or directors' decision, possibly a solicitor.

The property manager asks for more information, forwards the request, chases the response, and in between forgets which stage each one is at. The leaseholder chases too, often while their builder is waiting.

The lease and the block's regulations decide what needs consent and who gives it, and that differs from block to block. So there is no standard process, just a property manager working it out from the lease each time.

Requests usually arrive incomplete. Without drawings, flooring specifications or a pet description, nothing can be decided, and the first round of emails is spent getting basic information. After that, the request moves between parties with no single place showing where it has got to.

What that costs you and the block

Leaseholders grow frustrated, and some go ahead without consent, which creates bigger problems later: noise complaints about new flooring, disputes over structural work, or a sale held up because consent was never recorded.

Fees for handling consents are sometimes forgotten, and the conditions attached to a consent are hard to find when a neighbour complains years later.

We build a tracker that manages the admin around consent requests. It does not interpret leases or give legal advice; it follows the rules and approval routes you set for each block.

  1. Request forms by type: alterations, flooring, pets, subletting and other common requests each have a form asking for the documents your process needs, such as plans or specifications.
  2. Block rules: for each block you record which request types need consent and who decides, for example directors, the freeholder, or a surveyor first. The form routes accordingly.
  3. Fees: where your firm or the freeholder charges for handling a request, the fee is taken by card before the request moves forward.
  4. Approval route: the request goes to each party in turn with the documents attached. Each can approve, decline or add conditions, and the leaseholder sees the current stage.
  5. Consent record: once decided, the outcome and any conditions are stored against the flat, with the documents, so they can be found later.
  6. Reminders: requests that sit with one party too long trigger a reminder to them and a flag to the property manager.
Request typeTypical documents asked forWho decides
Structural alterationsPlans, contractor detailsSet per block, often freeholder with surveyor input
Flooring changeSpecification of flooring and underlaySet per block
PetType and description of animalSet per block, often directors
Subletting or short letsProposed arrangementSet per block and lease

How the process feels afterwards

Leaseholders submit complete requests the first time and can see where theirs stands. Property managers stop acting as a relay between parties and simply monitor the queue. Directors or freeholders get requests in a consistent format with everything attached.

Years later, when a neighbour complains about noise from wooden floors, the consent and its conditions are on file for that flat.

Signs this is your situation

  • Consent requests arrive by email with information missing.
  • Property managers are unsure which stage each request has reached.
  • Handling fees are sometimes forgotten.
  • Past consents and their conditions are hard to find.
  • Leaseholders have gone ahead with works without waiting for a decision.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does the system decide whether consent is needed?

No. That depends on the lease and your advisers. You tell us the rules for each block and the system routes requests accordingly.

Can it read our leases to set the rules?

A language model can help find the relevant clauses for a person to read, but the rules are set and checked by your team and advisers.

Can freeholders and directors use it without training?

Yes. They receive an email with a link to review the request and its documents and record a decision.

What happens to requests already in progress?

We import open requests at their current stage so the tracker reflects where each one actually is.

Keep reading

More on Problems We Solve

Start here

Tell us where your block management admin gets stuck

Describe the task, how many blocks it touches and which system you run them on. We will tell you what we would automate, what should stay with your property managers, and if a smaller change to your current setup would fix it, we will say that instead.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →