How Do We Get Electrical and Building Control Certificates From Our Subcontractors Before Handover?

Bathroom fitters chase subcontractor certificates for weeks after handover. We build certificate tracking per job that requests, reminds and files each one.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Kitchen and bathroom fitters struggle to collect certificates because the electrical, gas and building control paperwork is produced by subcontractors on their own systems, often weeks after the work. We build per-job certificate tracking that knows which documents each job needs, requests them from the right subcontractor, reminds them, files what arrives and shows the office what is still missing before handover.

The customer asks for the paperwork

The bathroom was finished a month ago. The customer is selling the house and their solicitor wants the electrical certificate for the new shower circuit and the notification for the work. Your electrician, who is self-employed, did the work and says he sent it. Nobody can find it. He resends it a fortnight later after three texts.

On a kitchen job it might be the gas engineer's record for moving the hob, or the building control notice for knocking through a wall.

Why the paperwork arrives late

Certificates are produced by the people who did the regulated part of the work, usually on their own software and often in the evening once they are home. You depend on them, but they are working for several businesses at once.

  • Nobody lists, per job, which certificates or notifications are expected.
  • Requests are made by text and not tracked.
  • Documents arrive by email to whoever is handy and are not filed on the job.
  • Handover happens before paperwork is complete, and chasing afterwards has less urgency.
  • Different subcontractors send documents in different formats and names.

Which certificates or notifications a job needs is for your qualified trades and the relevant schemes to confirm. The system tracks what they tell you is required.

The cost of missing certificates

Customers need these documents, and they usually need them at an awkward moment, such as a sale or an insurance claim. When you cannot produce them, it reflects on you, not the subcontractor. The office spends time chasing that could be spent on live jobs. And a handover pack with gaps undermines an otherwise good job.

Certificate tracking we build per job

  1. Each job lists expected documents based on its scope, such as new circuits, gas work, structural changes or ventilation, as your team defines the rules.
  2. Each document is assigned to the subcontractor who did that part of the work.
  3. When their stage is marked complete, they receive a request by email or text with an upload link specific to that job.
  4. Reminders follow on a schedule you set, and the office sees who has been asked, when, and how many times.
  5. Uploaded documents are checked for the right job address and stored on the job, and the office confirms each one.
  6. The handover pack will not be issued until required documents are in, unless a manager chooses to issue it with a note.
DocumentFromStatus
Electrical certificateElectricianRequested, reminded
Gas work recordGas engineerReceived, confirmed
Building control noticeContractor or inspectorAwaiting
Product guaranteesOfficeFiled

What the office stops doing

Nobody keeps a mental list of whose paperwork is missing. Subcontractors get a clear request with a link, not a vague text. Documents land on the right job. And when a customer rings a year later for a certificate, it takes seconds to send.

Subcontractors often prefer it as well. A clear request, with the job address and a link, is easier to deal with than a string of texts from different people in your office. They upload once and are not chased again for the same document. And because the request arrives when their stage is marked complete, it reaches them while the job is still fresh in their mind, rather than weeks later when they have to dig the details out.

Is your certificate chasing like this?

  • Customers have asked for a certificate you could not find.
  • Certificates arrive by text or personal email.
  • Handover packs regularly go out incomplete.
  • You chase the same subcontractor for paperwork several times per job.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Do subcontractors need an account?

No. They get a link for that job and upload the document from their phone or computer.

Will this tell us which certificates we need?

No. Your qualified trades and their schemes decide that. You set the rules once and the system applies them to each job.

Can it read the certificates to check them?

It can read basic details such as address and date to catch a document filed on the wrong job. It does not check the technical content.

What affects the cost?

The number of subcontractors and document types, and whether it sits inside an existing job system.

Keep reading

More on Problems We Solve

Start here

Tell us where your kitchen and bathroom jobs slip

Describe how a job moves from enquiry to handover in your business, which design and accounts software you use, and where things get lost. We will tell you what we would build and what we would leave alone, and if a better habit or a setting in your existing software would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →