How Do We Run Snagging at Practical Completion Without Retyping Notes and Chasing the Builder for Weeks?

Architects write snagging lists on paper, retype them and chase contractors for weeks. We build a snagging tool with photos, locations and contractor sign-off.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Snagging drags because items are noted on paper or in a phone note during the walk-round, retyped into a Word list, sent to the contractor, and then tracked by email until they are closed. We build a snagging tool where each item is captured on a phone with a photo, room and marked-up plan location, sent to the contractor at once, and closed by the contractor with a photo, for the architect to accept.

A walk-round, a clipboard and a long evening

Practical completion inspection on a new house. The architect walks every room with a clipboard and a phone. Paint missed behind a radiator. A door that catches. Silicone not finished in the en suite. A light switch not level. A crack in the render near the porch. Some items are photographed, some just written down. That evening, the architect types up the list in Word, trying to match photos to items and remember which bedroom was which.

The list goes to the contractor. Over the following weeks, the contractor says items are done; the client says they are not. Nobody is quite sure which items are still open, and the list has been revised four times.

Why snagging takes so long to close

The list is created in one medium, retyped into another, and tracked in email. Items lack precise locations and photos, so the contractor's operatives have to guess. Closure is reported in bulk: 'all done'. And the client, who often walks the house themselves, adds items in their own emails.

  • Items are noted on paper and retyped.
  • Photos are not linked to items.
  • Locations are vague, such as 'bedroom 2'.
  • Contractors report completion in bulk.
  • Clients add items separately by email.
  • Nobody has one list with the current status of every item.

What slow snagging costs

The architect's time, which at this stage of the project is usually well past the fee. Tension between contractor and client, with the architect in the middle. And for whoever administers the contract, uncertainty about whether items are complete when it comes to certification, where the contract administrator's judgement applies.

A snagging tool on the phone

  1. The project's floor plans are loaded, with rooms named.
  2. During the walk-round, the architect adds each snag on a phone or tablet: tap the location on the plan, take a photo, choose a trade and type or dictate a short description.
  3. The client can be invited to add their own items to the same list, which the architect reviews before they go to the contractor.
  4. The list is sent to the contractor immediately, as a link or PDF, grouped by room or trade.
  5. The contractor marks each item as done with a photo of the fix.
  6. The architect reviews each closed item and accepts it or reopens it with a comment.
  7. The list shows current status at any time, and a report can be produced for the file or for certification decisions.

The tool records items and their status. Decisions about practical completion and certification remain with the contract administrator under the contract.

One snag, start to finish

StepClipboard methodSnagging tool
CaptureNote on paper, photo separatePhoto, plan location and note together
Issue to contractorTyped up that eveningSent at the end of the walk-round
Closure'All done' emailPhoto of each fix
AcceptanceRevisit and argueAccept or reopen each item
RecordSeveral Word versionsOne list with history

Handovers that finish

The list is ready when the walk-round ends. The contractor knows exactly where each item is. Closure is item by item with evidence, which leaves less room for argument. The client sees progress without writing long emails. And the architect's time at the end of the project, which is usually unpaid, is kept to a minimum.

Is snagging like this for you?

  • Snagging lists are written on paper and typed up later.
  • Photos and snag items are not linked.
  • Contractors report everything done at once.
  • Clients send separate lists by email.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does the contractor need to install anything?

No. They receive a link and can update items from a phone or computer.

Can clients add snags themselves?

Yes, if you invite them. Their items are reviewed by the architect before going to the contractor.

Does it decide practical completion?

No. It records items and status. Certification decisions remain with the contract administrator.

What affects the cost?

The number of projects and users, whether you want client access and reporting templates, and where records are stored.

Keep reading

More on Problems We Solve

Start here

Tell us where your practice's admin eats design time

Describe the problem, the tools your practice uses and who deals with it today. We will tell you what we would build, and if a smaller change to your current setup would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →