How Can We Pull Together a Site's Planning History and Constraints Without Spending a Day on Council Websites?

Architects spend hours on council sites checking planning history and constraints for each site. We build a site pack that gathers the public data in one place.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Site research is slow because planning history, conservation areas, listed buildings, tree preservation orders, flood zones and other constraints sit in different council and government sources, each searched by hand. We build a site pack that takes an address, gathers what public data sources provide, lists previous applications with links and flags constraints for the architect to verify, so feasibility starts from a complete picture.

Twelve browser tabs for one address

A new enquiry for a house in a town you have not worked in before. Before the feasibility study, someone needs to know the site's context. Is it in a conservation area? Is the house or a neighbour listed? Is there an Article 4 direction? Any tree preservation orders? What flood zone is it in? What applications have been made on this property and its neighbours, and what happened to them?

So a part 2 architect opens the council's planning search, then the council's map of conservation areas, then the national listed building register, then the flood map, then the council's tree preservation order page. Each council's website is different. Some have maps, some have PDFs. An afternoon later, there is a page of notes, and the architect is still not sure they have found everything.

Why this is still manual

The information is public, but it is fragmented. Each council runs its own planning register and constraint maps, often on different systems. National datasets cover some designations but not others, and not always up to date. There is no single place to type an address and see everything, so each practice builds the picture by hand for every site.

  • Planning registers differ by council and are searched one at a time.
  • Constraint maps are in different formats, some only as PDFs.
  • Neighbouring applications, often the most useful precedent, are hard to find.
  • Findings are written up in notes that vary by person.

What slow site research costs

Feasibility time is often unpaid or on a small fee, so hours spent on research come straight off the margin. A missed constraint, such as an Article 4 direction removing permitted development rights, can mean advice to the client that has to be corrected later. And the same council gets researched again from scratch on the next job in that area.

A site pack from an address

  1. The architect enters an address or drops a pin, and the site boundary is identified from public mapping data where available.
  2. Designations are checked against national and council datasets that are published in usable form, such as conservation areas, listed buildings, flood zones and, where published, tree preservation orders and Article 4 directions.
  3. The council's planning register is searched for applications on the site and nearby, and results are listed with the decision, date and a link to the documents.
  4. A language model can summarise the decision notices of relevant nearby applications, such as what was approved and any common reasons for refusal, with links to the originals.
  5. The pack is produced as a single document or page, clearly showing which sources were checked, when, and which could not be checked automatically.
  6. The architect verifies the findings, adds their own notes and files the pack to the project.
  7. Each council's quirks are captured once, so the next site in the same area is quicker.

The pack is a research aid. Designations and planning history should be confirmed with the local planning authority, and planning judgement stays with the architect and, where needed, a planning consultant.

What the pack covers

ItemSource typeChecked automatically?
Conservation areaNational or council dataWhere published
Listed buildings nearbyNational registerYes
Flood zoneGovernment flood map dataYes
Article 4 and TPOsCouncil dataWhere published
Planning history on and near the siteCouncil registerWhere searchable

Feasibility that starts from the full picture

The architect begins the feasibility with the constraints and precedents in front of them, and with a clear list of what still needs checking by hand. Advice to the client is grounded from the start. And the pack becomes part of the project record, useful again when the planning application is prepared.

Is this your feasibility process?

  • Site research means an afternoon on council websites.
  • Each architect records findings in their own way.
  • Nearby planning applications are hard to find.
  • A constraint has been missed at feasibility before.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Can you cover every council?

Coverage depends on what each council publishes and how. The pack always shows which sources were checked and which need a manual check.

Is this planning advice?

No. It gathers public information for the architect to verify and interpret. Planning judgement stays with your team.

Where does the data come from?

Public national datasets and council planning registers and maps, used within their terms.

What affects the cost?

The councils you work in most, how their data is published and what format you want the pack in.

Keep reading

More on Problems We Solve

Start here

Tell us where your practice's admin eats design time

Describe the problem, the tools your practice uses and who deals with it today. We will tell you what we would build, and if a smaller change to your current setup would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →