Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Can We Catch Title Block Mistakes, Missing Revisions and Wrong Scales Before Drawings Leave the Office?
Problems We Solve

How Can We Catch Title Block Mistakes, Missing Revisions and Wrong Scales Before Drawings Leave the Office?

Architects issue drawings with wrong title blocks, missing revision notes and odd scales. We build automated pre-issue checks so a person reviews the flags.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Avoidable drawing errors get through because the final check before issue is a quick look by a busy person at the end of a deadline, and the same simple mistakes, such as a stale revision cloud, a wrong status, an out-of-date title block or a scale that does not match the viewport, are easy to miss. We build automated checks that run on the PDFs and model data before issue, list what looks wrong on each sheet and leave the design review to your people.

Issued at 5.55 on a Friday

The tender package has to go out by six. Thirty sheets are exported. A senior architect flicks through them. They go. On Monday the contractor rings: the revision on the roof plan is C, but the revision table only shows B; three sheets still say 'Preliminary' rather than 'Tender'; one sheet has the previous project's name in the title block; and a detail labelled 1:5 is plotted at a size that is clearly not 1:5.

None of this is design error. It is the kind of mechanical slip that a tired person misses at the end of a deadline, and it makes the practice look careless.

Why simple errors survive

Quality checks before issue are real in most practices, but they are done by people under time pressure, and people are good at design review and poor at checking thirty title blocks for consistency. Many errors are the same each time: status not updated, revision table not matching the revision, a template left from another project, a viewport scale changed without updating the label.

  • The final check happens at the last moment.
  • Title block and revision details are checked by eye.
  • Templates carry information from other projects.
  • Scale labels and viewports can disagree.
  • The same errors recur because nobody records them.

What avoidable errors cost

Reissues and correction emails, confusion about which sheet is current, and contractors or consultants working from sheets with the wrong status. None of it is dramatic, but each one erodes confidence in the package and takes time to fix. And the check that did happen was time spent on the wrong things.

Automated checks before every issue

  1. We agree the checks with your team, based on your standards and the errors you see most, and record them as rules.
  2. Before issue, the exported PDFs, and where available the model's sheet data, are run through the checks.
  3. Title blocks are read and checked for project name and number, drawing number format, status matching the purpose of issue, date and revision.
  4. Revision letters are compared with the revision table on each sheet, and with the drawing register.
  5. Scale labels are compared with the sheet's scale data where the model provides it, and inconsistencies are flagged.
  6. A short report lists each sheet with anything that looks wrong, for a person to confirm or dismiss.
  7. Recurring issues are counted, so templates and habits can be fixed at source.

The checks are mechanical. Whether the design is right, coordinated and buildable is for your reviewers, who now have more time for it.

Because the checks are automatic, they can be run at each internal review as well as at the final issue, so problems with templates or title blocks are fixed early in the stage rather than at the deadline.

A pre-issue report

SheetCheckResult
Roof planRevision matches tableRevision C, table shows B
SectionsStatus matches purposeSays Preliminary, issuing for Tender
Details sheetProject nameDifferent project name found
Ground floor planAll checksNo issues

Illustrative report format.

Checks that free up the reviewer

Mechanical mistakes are caught in the minutes before issue, not by the contractor after it. The senior architect's check can focus on the design, coordination and the things only a person can judge. And because recurring issues are counted, the practice can fix the template or habit that causes them.

Recognise these slips?

  • Drawings have gone out with the wrong status or revision.
  • Title blocks have carried another project's details.
  • Pre-issue checks happen at the last minute, by eye.
  • The same mistakes recur across projects.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does this check the design?

No. It checks mechanical items such as title blocks, revisions, status and scale labels. Design review stays with your team.

Which software does it work with?

It reads PDFs from any software, and can use sheet data from Revit, ArchiCAD or Vectorworks where available.

Can we add our own checks?

Yes. Rules are agreed with you and can be added as new recurring issues appear.

What affects the cost?

The number of rules, how consistent your title blocks are and whether model data is used alongside the PDFs.

Keep reading

More on Problems We Solve

Start here

Tell us where your practice's admin eats design time

Describe the problem, the tools your practice uses and who deals with it today. We will tell you what we would build, and if a smaller change to your current setup would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →