Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Get Every Defect Reported by Returning Charter Guests Fixed Before the Next Party Takes the Boat?
Problems We Solve

How Do We Get Every Defect Reported by Returning Charter Guests Fixed Before the Next Party Takes the Boat?

Yacht charter turnaround defects get lost between check-in, engineers and the next charter. We build a turnaround job list that tracks every fix.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Defects slip through turnaround because they are reported on paper, by guests, by the check-in team and by skippers, and passed to the maintenance team by word of mouth on the busiest day of the week. We build a turnaround job list for each boat that gathers every defect with photos, lets the base prioritise by the next departure, tracks parts and contractors, and shows clearly which boats are ready and which are not before the next guests arrive.

The few hours between charters

On changeover day, a boat comes back in the morning and goes out again in the afternoon. In between, it is cleaned, refuelled, restocked and fixed. The fixing is where things go wrong.

Returning guests mention that the heads pump was stiff, the anchor windlass tripped twice, and the cabin light in the aft cabin does not work. Some of this is written on the check-in form. Some is said to the person on the pontoon, who tells an engineer, who is already working on another boat. A skipper on a skippered charter sends a WhatsApp about the autopilot. The base manager has a mental list. By early afternoon, some of it is done, some is waiting for a part, and some has been forgotten.

The next guests find the aft cabin light still does not work. On the second day, the windlass trips again in a quiet bay, and they ring the base.

Why defects go missing

Source of the defectHow it is passed onHow it gets lost
Returning guestsTold to base staff at check-inRemembered, or not, by the person who heard it
Check-in inspectionWritten on the paper formForm not read by the engineers in time
Skippers on skippered chartersPhone or chat messageBuried among other messages
Mid-charter calls from guestsPhone to the baseFixed on the spot or noted, not recorded against the boat
Engineers' own findingsMemoryDeferred and forgotten

There is also no clear picture of priority. A broken cabin light and a failing bilge pump are not the same, and the boat leaving first should get attention first.

What an unfixed defect costs

  • Guests who start their charter with something broken and feel short-changed.
  • Callouts during the charter, which take an engineer away from the base.
  • Repeat faults that are fixed in a hurry rather than properly.
  • Parts ordered late, because the defect was only confirmed on the morning of the next departure.
  • No history for each boat, so recurring problems are not spotted.

Whether a boat is fit to go out is a decision for your base and your technical team. What we can help with is making sure they have every reported defect in front of them in time to make it.

A turnaround job list for every boat

What we build gathers defects from every source into one list per boat, and follows each one to done.

  1. Defects are logged from the tablet check-in, from a simple form for guests and skippers, and from the base team's phones, each with a photo and the boat it relates to.
  2. Each defect gets a category and priority set by the base, with guidance from your own rules about what must be fixed before departure and what can wait.
  3. The job list is sorted by the next departure time for each boat, so the boat leaving first is worked on first.
  4. Engineers mark jobs as done, deferred or waiting for parts from their phone, with notes and photos.
  5. Parts needed are recorded and can be sent to your chandlery or supplier as an order.
  6. Deferred jobs stay on the boat's record and appear again at the next turnaround.
  7. Before each departure, the base manager sees which boats are clear, which have open items and what those items are, and makes the call.
  8. Over the season, each boat builds a defect history that shows recurring faults.

Changeover afternoon, with a clear board

The base manager sees one screen: each boat, its next departure, and its open jobs. Engineers work from the same list instead of from memory. Nothing a guest mentioned at the pontoon disappears.

The next guests find the boat as it should be. When something does fail mid-charter, it is logged against the boat and considered at the next turnaround. Over the winter, the defect history helps you plan the refit list from facts rather than impressions.

Does this happen at your base?

  • Defects are passed to engineers by word of mouth.
  • Guests report the same fault the previous party mentioned.
  • Parts are ordered on the morning of departure.
  • Deferred jobs are forgotten.
  • There is no defect history per boat.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Will this tell us whether a boat can go out?

No. That decision is your base's and technical team's. The job list makes sure they have every reported defect in front of them.

Can guests report defects during the charter?

Yes, through a simple form or message link, which logs the defect against their boat for the base to see.

Does it link to our check-in and check-out records?

It can. Defects found during a digital check-in feed straight into the job list.

What drives the cost?

The number of boats and bases, how defects are reported now, and whether you want parts ordering and history.

Keep reading

More on Problems We Solve

Start here

Tell us where your charter office gets stuck

Describe the part of the season that eats your office's time, the booking system you use, how you take payments and how your bases record handovers. We will tell you what we would build around what you already run, and if your booking system can already do it, we will say so rather than build something new.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →