Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Keep Track of Every Cutdown, Aspect Ratio, Subtitle and Format a Client Needs Delivered?
Problems We Solve

How Do We Keep Track of Every Cutdown, Aspect Ratio, Subtitle and Format a Client Needs Delivered?

One video production job becomes forty deliverables in different ratios and languages. We build a deliverables matrix that tracks each file to delivery.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Deliverables get missed because one film turns into many files, each with its own length, aspect ratio, subtitles, audio mix and platform specification, tracked on a spreadsheet the editor never sees. We build a deliverables matrix per job that lists every required file with its spec, links each to its export, checks technical specs automatically and shows what is left to deliver.

Forty files from one film

A campaign film has a 60-second master. The client also needs 30, 15 and 6-second cutdowns, each in 16:9, 9:16, 1:1 and 4:5, with burnt-in subtitles for social, a clean version for broadcast with a separate audio mix, and English and Welsh versions. Some go to a media agency with its own technical specs.

The producer keeps a spreadsheet. The editor keeps a list on a sticky note. Exports are named however the editor chose that day. A week after delivery, the media agency rejects two files for the wrong loudness level, and the client asks where the Welsh 9:16 15-second version is. It was never made.

Why deliverables fall through

  • The list of deliverables lives with the producer, but the work is done by the editor.
  • Specs differ by platform and by media agency, and change between campaigns.
  • File naming is inconsistent, so matching exports to the list is manual.
  • Technical checks, such as loudness, frame rate and resolution, are done by eye, or not at all.
  • Late changes to the master mean every derived file must be re-exported, and some are missed.

What missed deliverables cost

Rejected files hold up campaign launches. Missing versions are noticed by the client at the worst time. Re-exports after a late change to the master take editor time that was not planned. And a delivery with gaps makes a well-made film look carelessly finished. The editor, who knows the film best, ends up doing hours of repetitive exporting and checking at the end of a job, which is the part of the work most likely to go wrong when someone is tired.

How we build the deliverables matrix

  1. At the start of a job, the deliverables are entered as a matrix: length, aspect ratio, language, subtitles, audio mix and destination, with the spec for each.
  2. Specs can come from saved templates for common destinations, or from the client's or media agency's spec sheet.
  3. Each deliverable gets a standard file name, generated from its row, which the editor uses when exporting.
  4. When exports land in the delivery folder, they are matched to their row by name and checked automatically for resolution, frame rate, duration, codec and loudness against the spec.
  5. Files that fail a check show in red with the reason, before anything goes to the client.
  6. If the master changes after deliverables are made, every file derived from it is marked as needing re-export.
  7. The matrix view shows done, failed, and not started, so the producer and editor see the same list.
Deliverable fieldChecked against export
LengthDuration of the file
Aspect ratio and resolutionFrame size
Frame rate and codecFile properties
LoudnessMeasured audio level against the spec
Language and subtitlesFile name and a spot check by a person

Delivering the next campaign

The producer builds the matrix from the media agency's spec sheet and the client's list. The editor exports with the generated file names. Two 9:16 files fail the loudness check and are fixed before delivery. The Welsh 15-second 9:16 shows as not started, so it is made.

When the client changes a line in the master, the matrix marks every derived file for re-export, and the editor works through them from the list rather than from memory.

The delivery email is generated from the matrix too, listing every file with its spec, which the media agency can check against their own sheet before they start trafficking the campaign.

Is this your delivery week?

  • Deliverables are tracked on a spreadsheet the editor does not use.
  • Files have been rejected for technical specs.
  • Versions have been missed until the client asked.
  • File names vary from job to job.
  • Late master changes lead to missed re-exports.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does it export the files for us?

Not in the first version. The editor exports as normal, and the matrix checks and tracks them. Automated exports can be looked at later.

Which technical checks can it do?

Duration, resolution, frame rate, codec and loudness are the common ones. Others depend on your specs.

Can it use media agency spec sheets?

Yes. Specs can be entered from their sheets and saved as templates for next time.

What drives the cost?

The number of spec templates, the checks you need, and where your delivery folders live.

Keep reading

More on Problems We Solve

Start here

Tell us how sign-off, deliverables and licences work at your company

Describe how a film gets from final cut to delivered files at your company, where music licences and release forms are kept, and which tools you already use. We will tell you what we would build and what is better handled by a tidy folder and a checklist, and we will say so if that is all it needs.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →