Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Can Our Lab See Which Samples Are About to Miss Their Turnaround Time?
Problems We Solve

How Can Our Lab See Which Samples Are About to Miss Their Turnaround Time?

Testing labs find late samples only when clients complain. We build turnaround tracking that shows each sample's due time and flags risks while there is time.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Most labs know their turnaround commitments but cannot see, sample by sample, which work is at risk until it is already late. We build turnaround tracking that calculates a due time for every sample and test from your service levels, shows where each one is in the workflow, and flags work at risk to the section leader early enough to reprioritise. It reads from your LIMS and does not change how testing is done.

Late results discovered by the client

A client phones: their results were due yesterday. The customer services team looks the samples up in the LIMS and finds one test still waiting in a queue in the chemistry section. Nobody in that section knew it was urgent, because the standard, express and contract turnaround options all look the same on the worklist.

Every lab has a version of this. Turnaround is promised at the order stage, but the people doing the work see a list of samples, not a list of deadlines.

Why late work is invisible until it is late

  • Due times are not stored per sample, or are stored but not shown on worklists.
  • A sample with several tests is only as quick as its slowest test, often in another section.
  • Subcontracted tests have their own timelines outside your LIMS.
  • Worklists are sorted by arrival, not by due time.
  • Management reports on turnaround are produced after the fact, monthly.

Turnaround performance is usually measured, but measured backwards: what percentage was on time last month. What section leaders need is the forward view: what will be late this afternoon unless someone moves it.

What late samples cost

Clients who rely on quick results, whether for production release, clinical decisions by their own clinicians, or environmental compliance deadlines, lose confidence and may move work elsewhere. Express surcharges may need refunding under your terms. Staff spend time firefighting and answering chasing calls, and overtime goes up at the end of the week as everyone tries to catch up.

QuestionWithout trackingWith turnaround tracking
When is this sample due?Look up the orderShown on every worklist
What is at risk today?Nobody knowsAt-risk list for each section
Which test is holding a sample up?Check each sectionShown on the sample's timeline
How did we do last week?Monthly reportLive view with drill-down

How we build turnaround tracking

  1. We record your service levels: standard, priority and contract turnaround per test or suite, and whether they count working hours, calendar days or receipt cut-off times.
  2. For every sample and test, a due time is calculated at registration from those rules, and stored.
  3. Status data is read from your LIMS, through its database, API or regular export, so each test's stage is known: received, in preparation, in analysis, awaiting review, authorised.
  4. Where a test normally takes a known time in each stage, the tracker estimates whether it will make its due time and flags those at risk.
  5. Each section gets a screen, or a sorted worklist, showing its tests in due-time order with at-risk work highlighted.
  6. Subcontracted tests are tracked against the date the partner lab has committed to.
  7. Managers see a live view of on-time performance by section, client and test, with the ability to drill into any late sample.

The tracker reads and alerts. It does not change priorities by itself. Section leaders decide how to reorder work, which they can now do with the facts in front of them.

What changes on the lab floor

Section leaders start the day knowing what must be finished and what is at risk. Priority samples are visibly priority. Customer services can tell a client when to expect a result, and why, without walking round the lab. Managers can see where time is actually lost, whether at reception, in a particular section or at authorisation, and plan staffing or equipment on evidence.

Is this your lab?

  • You find out about late results when clients phone.
  • Worklists do not show due times.
  • Priority samples are marked with stickers or handwritten notes.
  • Turnaround is only reported monthly.
  • It is hard to tell which section is holding up a sample.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does this need changes to our LIMS?

Usually not. We read status data from it. If due times can be written back to it, we can do that too.

Can it handle different turnaround rules per client?

Yes. Contract turnaround for a client can override your standard rules.

How does it estimate whether a test will be late?

From your stage times and the test's current stage. It is a warning to a person, not a prediction you have to trust blindly.

What affects the cost?

How status data can be read from your LIMS, the complexity of your service levels, and how many sections need their own screens.

Keep reading

More on Problems We Solve

Start here

Tell us where samples and paperwork get stuck

Describe how work moves through your lab today, the LIMS or spreadsheets you use and where the retyping and chasing happens. We will tell you what we would build around your existing systems, and if a smaller change would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →