Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Pay Subcontract Solar Install Teams Correctly for the Jobs They Actually Completed?
Problems We Solve

How Do We Pay Subcontract Solar Install Teams Correctly for the Jobs They Actually Completed?

Solar installers pay subcontract roofers and electricians from texts and memory. We build job sign-off that produces each team's payment run from agreed rates.

Updated 2 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Subcontractor payments go wrong because the work each team did is recorded in texts and memory, rates vary by job type and extras, and invoices arrive in any format. We build job sign-off that records which team did which stage, applies your agreed rates, and produces a payment run that matches each subcontractor's invoice, with differences listed for a person.

Friday, and the roofers' invoice does not match

Your subcontract roofing team sends an invoice for the week: five roofs, two with 'extra rails', one with 'tile repairs'. The office checks: one of the roofs was only half done, because the electrician finished it. The tile repairs were agreed by phone with the install lead, who is not sure how many. The rate for the flat roof job was different. Working it out takes an afternoon and a slightly tense phone call.

Why subcontract payments are hard

  • Rates vary by job type, roof type, panel count and extras.
  • Extras are agreed on site by phone.
  • Stages are sometimes split between teams.
  • Subcontractors invoice in their own format.
  • The office has no clear record of who did what on each job.

What payment disputes cost

Overpayments nobody notices. Underpayments that damage relationships with good teams you need. Office time checking every invoice line. Late payments while disputes are sorted, which makes good subcontractors prefer other installers. And no view of what each job really cost in labour.

Payments built from job sign-off

  1. Your agreed rates for each subcontractor are set up by job type, stage and extras.
  2. When a stage is finished, the team signs it off on their phone, with photos. The install lead confirms.
  3. Extras, such as tile repairs or extra rails, are requested on site and approved by the install lead or office before the work, with the rate shown.
  4. At the end of the period, each subcontractor's statement is produced from signed-off stages and approved extras.
  5. Their invoice is matched against the statement; differences are listed for a person.
  6. Approved payments go to your accounting software, such as Xero or QuickBooks, for payment.
  7. Labour cost is recorded against each job, for margin reporting.

Statement versus invoice

LineStatementInvoiceResult
Roof, standardSigned offClaimedMatches
Roof, partly by another teamPart stageFull claimedDifference, check
Extra railsApprovedClaimedMatches
Tile repairsNot approvedClaimedDifference, check

Paying good teams promptly and correctly

Subcontractors know exactly what they will be paid for and why. Extras are agreed before they are done. Invoices are checked in minutes. Payment runs happen on time. And each job's labour cost is visible.

Agreeing extras before, not after

Most payment arguments come from extras agreed on site. A roofer finds broken tiles and replaces them, or needs extra rails for an awkward roof, and mentions it to the install lead in passing. Two weeks later it appears on an invoice at a rate nobody agreed.

Asking for extras to be requested on the phone, with the rate shown and approved before the work, feels like more admin at first. In practice it takes a minute and saves the argument. Good subcontractors usually prefer it, because they know they will be paid for approved work without having to justify it later.

The same records also show which roof types regularly need extras, which is useful when pricing future jobs.

Are subcontract payments a weekly argument?

  • Subcontractor invoices do not match your records.
  • Extras are agreed by phone and disputed later.
  • Checking invoices takes hours.
  • You cannot see labour cost per job.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Do subcontractors need to use an app?

They use a simple link on their phone to sign off stages. No account or download is needed.

Can it produce self-billing invoices?

It can, if you and your subcontractors have agreed self-billing. Your accountant should advise on the arrangement.

Does it handle CIS deductions?

It can pass the information your accounting software needs. How CIS applies is a matter for your accountant.

What if a job is shared between teams?

Stages can be split and signed off by each team, so each is paid for their part.

Keep reading

More on Problems We Solve

Start here

Tell us where the admin is slowing your installs

Describe the problem, the CRM or design software you use and who handles it now. We will tell you what we would build, and if a change to your current setup would do the job, we will say that instead.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →