How Do We Make Sure Panels, Inverters and Batteries Are Set Aside for Each Solar Job?

Solar installers find the inverter or battery for a job was used elsewhere. We build stock allocation per job, with shortages flagged before install day.

Updated 2 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Stock goes missing on install day because the warehouse holds panels, inverters and batteries in one pile, and teams take what they need for today without seeing tomorrow's jobs. We build job-level allocation from your design bill of materials, so each job's equipment is reserved when it is booked, shortages show up days ahead, and teams pick from a job list rather than a shelf.

The battery that went to the wrong job

On Monday a team loads the van for a job and takes the last hybrid inverter of that model, because it was on the shelf. On Wednesday the team for a different job, which was quoted and designed around that exact inverter, finds none left. The supplier can deliver on Friday. The install is moved, the scaffold stays up, and the homeowner is told the date has changed again.

Nobody made a mistake exactly. The warehouse just did not know which inverter belonged to which job.

Why stock gets used twice

  • Stock is recorded as totals, not reserved for specific jobs.
  • The design's equipment list is not turned into a pick list.
  • Orders to wholesalers are placed from memory or a whiteboard.
  • Substitutions are made on the day without updating the design or paperwork.
  • Returned or unused items are not booked back in.

What stock mix-ups cost

Postponed installs, with all the rearranging that follows: scaffold, crew, homeowner. Emergency orders at worse prices. Substitutions that do not match the design, which then have to be reflected in the paperwork, the DNO submission and the job file. And cash tied up in items bought for jobs that were cancelled.

Equipment reserved job by job

  1. When a job is confirmed, its bill of materials is taken from the final design: panel model and quantity, inverter, battery, mounting system, isolators, cable.
  2. Items in stock are reserved against the job. Items not in stock are added to a purchase list for your wholesaler, grouped by supplier.
  3. The install schedule shows each job's stock status: fully reserved, awaiting delivery, or short.
  4. Shortages for jobs in the next week or two are flagged to the scheduler and purchaser with enough time to act.
  5. Teams pick from a job pick list and scan items to the job, which records serial numbers for the job file at the same time.
  6. Substitutions need a person to approve them, and prompt a check of the design and paperwork.
  7. Unused items are scanned back into stock when the van returns.

Stock status by upcoming job

JobInstallPanelsInverterBatteryStatus
Job AMondayReservedReservedReservedReady
Job BWednesdayReservedShortNot neededOrder today
Job CNext weekAwaiting deliveryReservedAwaiting deliveryOn order

Install days that go ahead

Each job's equipment is set aside when it is booked. Shortages are seen days ahead, not on the morning. Orders are placed from a list. Serial numbers are captured as items are picked. And substitutions are deliberate and recorded, not a surprise found in the job file.

Serial numbers as a side benefit

Scanning items to a job at the pick stage does two jobs at once. It confirms the right equipment is going on the van, and it records the serial numbers of the panels, inverter and battery for that job. Those serial numbers are exactly what the job file needs for registration, and exactly what a warranty claim will ask for years later.

Without the scan, serial numbers are usually written down on the roof, photographed if someone remembers, or looked for later on a label that is now behind a battery on a garage wall. Capturing them in the warehouse is far easier.

Has this happened to your teams?

  • Installs are moved because an item was used on another job.
  • Wholesaler orders are placed from memory.
  • Substitutions on the day are not reflected in the paperwork.
  • You do not know what stock is committed to upcoming jobs.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Do we need a full warehouse system?

Usually not. Job-level reservation and a pick list are enough for most installers. We suggest more only if your volume calls for it.

Can it order from our wholesaler?

It produces purchase lists by supplier. Sending orders electronically depends on the wholesaler's systems.

Where does the bill of materials come from?

From your design software's output or your CRM quote lines, depending on where it lives.

Does it work with Xero or QuickBooks stock?

Where you already track stock there, we can use it rather than creating a parallel record.

Keep reading

More on Problems We Solve

Start here

Tell us where the admin is slowing your installs

Describe the problem, the CRM or design software you use and who handles it now. We will tell you what we would build, and if a change to your current setup would do the job, we will say that instead.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →