Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Keep Track of Fabricated Parts Going Out for Powder Coating in Dozens of RAL Colours?
Problems We Solve

How Do We Keep Track of Fabricated Parts Going Out for Powder Coating in Dozens of RAL Colours?

Sheet metal parts wait at the coater, come back in the wrong RAL or short, and hold up assembly. We build finishing tracking by colour, batch and return date.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Powder coating causes delays because parts for many jobs go out on one delivery, in many colours and finishes, and come back in several loads with no clear record of what should return. We build finishing tracking that groups parts ready for coating by colour and finish, produces the coater's paperwork, records what left and what is due back, and checks each return against the list.

A van full of brackets in eleven colours

Friday's van to the powder coater carries parts from nine jobs: RAL 9005 matt black enclosures, RAL 7016 anthracite panels, some zinc primer and 9010 white, and a handful of brackets in a customer's own colour code. The delivery note is written by hand and lists jobs, roughly. The coater batches their own ovens by colour, so the parts come back over the next week and a half in several loads.

On Wednesday, assembly is waiting for four black panels that the coater says were never on the van. Or they were, and they came back in gloss rather than matt.

Why coating is where parts get lost

Finishing is the most mixed up stage of a fabricator's flow. Parts from many jobs leave together, get split by colour at the coater, and return in a different grouping. Without a detailed record of what went, nobody can check what came back.

  • Delivery notes to the coater list jobs, not individual parts and colours.
  • Colour and finish details, such as matt, satin, texture or primer, are on the drawing only.
  • Parts are sent out as soon as they are ready, not grouped by colour.
  • Expected return dates are not recorded.
  • Returns are checked against memory rather than a list.

What finishing delays cost

Assembly and dispatch waiting on a few coated parts. Parts recoated at your cost because the wrong finish was applied, when the instruction was ambiguous. Arguments with the coater about what was sent. And sometimes a whole job's delivery date missed because one colour sat at the coater waiting for enough work to justify an oven run.

The finishing tracking we build

  1. Each part carries its finish from the drawing or job: coating type, RAL or colour reference, gloss level, texture, pre-treatment and any masking.
  2. Parts ready for finishing are shown grouped by colour and finish, so you can see what is waiting for each coater run and plan a van accordingly.
  3. The delivery note lists every part, quantity, colour, finish and masking note, with job numbers and your reference. It can be emailed to the coater ahead of the van.
  4. Each dispatch records the expected return date from the coater's usual turnaround for that finish.
  5. Returns are scanned against the list. Missing parts, wrong finishes and damage are flagged with photos, and a query goes to the coater the same day.
  6. Jobs waiting on coating show on the planner's view with their due date, so a colour that is holding up an assembly can be chased.
Recorded per partWhy
Colour reference and glossAvoid wrong finish returns
Texture and pre-treatmentClear instruction to the coater
Masking notesThreads, earth points and mating faces protected
Quantity sentCheck against quantity returned
Expected returnChase before assembly is waiting

What changes in the finishing area

The coater gets a clear list with every colour and finish spelled out, which leaves less room for a wrong guess. You can see which parts are away, which are late, and which jobs they are holding up. Short returns are found when the van unloads, not when an assembler goes looking. And you have a record of the coater's turnaround and error rate by finish, which is useful when you review who you use.

Planning improves too. Seeing parts waiting by colour lets you hold a small job for a day to join a bigger batch in the same colour, where that suits the customer's date.

Is finishing your black hole?

  • Delivery notes to the coater are handwritten.
  • Parts come back in the wrong colour or finish.
  • Assembly waits for coated parts that nobody can locate.
  • Returns are checked from memory.
  • You do not know how long each coater usually takes.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Does the coater need to use the system?

No. They receive a clear delivery note and emails. If they want, they can confirm dates by replying.

Can it handle galvanising and plating too?

Yes. Any outside finish is tracked the same way, with the details that matter for that process.

We coat in house. Is this still useful?

Yes. Grouping by colour helps plan your own oven runs, and the tracking works the same with your booth as the destination.

What about parts that are masked?

Masking notes are carried on the part record and printed on the delivery note, and can include a marked up image.

Keep reading

More on Problems We Solve

Start here

Tell us where your fabrication shop loses time

Describe how a job gets from drawing to delivery today: quoting, nesting, cutting, bending, welding and finishing, and which software you already run. We will tell you honestly what is worth building, and if your nesting or job software can already do it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →