How Do We Know How Many Tubes, Boards and Fittings Are in the Yard and How Many Are Standing on Each Site?

Scaffolding firms cannot say how much tube, board and fitting is in the yard or on each site. We build stock tracking from loading lists and yard returns.

Updated 2 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Scaffolding stock is hard to know because kit leaves the yard on wagons and comes back in mixed loads, with no count either way, so nobody can say how much is standing on each site or whether there is enough for next week. We build stock tracking fed by loading lists and yard returns, giving a running figure by item type for the yard and for every site.

Enough boards for Monday?

Two big jobs start next week. The yard foreman looks at the stacks and thinks there are probably enough boards, probably not enough of a certain tube length, and definitely a shortage of some fittings. He is guessing, based on what he can see and what he remembers is out.

Meanwhile a few sites have scaffolds that were struck weeks ago with kit still stacked at the side, waiting for collection, and one has more boards than the scaffold needs because the gang took extras.

Why stock figures are always a guess

Scaffold kit moves constantly between the yard and sites, in loads that are counted roughly if at all. Returns come back mixed, and damaged items are separated out without a record. Buying decisions and job planning are made on instinct.

  • Wagons are loaded without a written count.
  • Returns are unloaded and stacked without being counted.
  • Kit stacked on sites after strike is not tracked.
  • Damaged and scrapped items are not recorded.
  • Nobody knows the total owned, let alone where it is.

What guessing costs

Shortages found on the morning of a job, which means cross-hiring at short notice or sending a second wagon. Over-buying because nobody trusts the stock figures. Kit lost on sites because nobody knew it was there. And no basis for knowing how much kit a new contract would need.

Stock figures also matter when you are asked to take on a big commercial package. Without knowing how much kit you own and how much is tied up in current jobs, you cannot judge whether you can resource it without cross-hiring, which changes the price.

The stock tracking we build

  1. Your item types are set up: tube lengths, boards, fittings by type, system components if you use them, extras such as sheeting and ladders.
  2. Each load going out is recorded against the job from the loading list, adjusted by the yard to what actually went.
  3. Returns are counted by type in the yard when unloaded, on a phone or tablet, and set against the job.
  4. Damaged and scrapped items are recorded as they are separated out.
  5. Each site shows what is out there, in total and by type, and what is expected back at strike.
  6. The yard shows a running figure by type, and upcoming jobs show what they need against what is available.
  7. Periodic yard counts are entered to correct drift, and differences are shown so you can see where kit is going.
MovementRecorded from
Out to siteLoading list, confirmed by the yard
Back from siteYard return count
Damaged or scrappedYard entry when separated
Standing on siteOut minus back, per job
In the yardRunning total, corrected by counts

The counts do not have to be perfect. Rough, consistent counts give far better figures than none.

What you can see afterwards

Shortages show up days ahead, with time to plan. Kit waiting on struck sites is visible and gets collected. Buying is based on what you actually have. And the figure for kit out on a site is ready if there is ever a dispute about what came back.

Is your stock picture this vague?

  • Shortages are found on the morning of a job.
  • You do not know how much kit is on each site.
  • Returns are not counted.
  • You buy kit without knowing how much you own.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Do we have to count every fitting?

Fittings can be counted by bag or crate if that is how you handle them. Consistency matters more than precision.

Can we use barcodes or tags?

Yes, for system components or high-value items, though many firms start with counts by type.

Can it cope with system scaffold?

Yes. Components are set up as their own item types.

Does it tell us what to buy?

It shows shortages against planned jobs. Buying decisions are yours.

How do we start if we have never counted?

Start with a yard count and record movements from then on. Site figures build up as jobs are struck.

Keep reading

More on Problems We Solve

Start here

Tell us where your scaffolding yard and office lose track

Describe the problem, how your yard, drivers and office handle it now and which systems hold the information. We will tell you what we would build and what we would leave alone, and if a smaller change would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →