Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Work Out Scaffold Gang Price Work Pay Fairly and Quickly From the Jobs They Actually Did?
Problems We Solve

How Do We Work Out Scaffold Gang Price Work Pay Fairly and Quickly From the Jobs They Actually Did?

Scaffolding firms that pay gangs on price work calculate it by hand each week, and disputes follow. We build pay from recorded erects, strikes and alterations.

Updated 2 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Price work pay causes weekly arguments when it is worked out by hand from job sheets that do not say clearly what each gang erected, struck or altered. We build a pay calculation that works from the quantities recorded on each job, applies your own price work rates and splits, and shows each gang lead how their figure was reached before payroll.

Friday, a calculator and a disagreement

Your gangs are on price work: a rate for erecting, a rate for striking, something for alterations and extras. On Friday the owner goes through the job sheets with a calculator. One gang lead says they also did the loading bay on Tuesday. Another says the strike on Thursday was bigger than the sheet says. Nobody is lying. Nobody wrote it down properly.

The figures get agreed eventually, with some give on both sides, and payroll runs late again.

Why price work pay is contentious

Price work is a good system when the work is measured clearly. Scaffold job sheets rarely measure it: they record the job, not the quantity erected or struck, and alterations and extras are often not on them at all.

  • Job sheets record the site, not the quantity of work.
  • Alterations and extras are not recorded per gang.
  • Rates are in the owner's head or an old spreadsheet.
  • Splits between gang members are worked out separately.
  • Gang leads cannot see how their figure was reached.

What it costs

Owner time each week and friction with the people you rely on most. Overpaying when a gang's claim cannot be checked, or underpaying and losing good scaffolders to firms who pay reliably. And price work rates that never get reviewed, because nobody can see what each job actually paid.

There is also a hidden incentive problem. When the only record of a gang's work is their own claim, the gangs who write the most get paid the most, which is not the same as the gangs who do the most, and the good ones notice.

The price work calculation we build

  1. Your price work rates are set up by work type: erect, strike, alteration, extras, on whatever basis you use.
  2. Quantities for each job come from the quote or loading list and are confirmed by the gang lead when the work is done.
  3. Alterations and extras recorded on the gang lead's phone are priced at your rates for that gang.
  4. Work split between gangs, such as one erecting and another striking, is recorded per gang.
  5. Weekly figures are calculated per gang, and per person using your split rules.
  6. Each gang lead sees their week's figure with the jobs and quantities behind it, and can raise a query before it is finalised.
  7. Agreed figures go to your payroll person or package, and the pay cost is added to each job for costing.
Work recordedPaid at
Erect quantityYour erect rate
Strike quantityYour strike rate
AlterationsYour alteration rate
Extras fittedYour extras rate
Day workYour day rate

Rates, splits and the basis for pay are your agreements with your gangs. We calculate from them and show the working.

What Fridays look like after

Gang leads see their figures as the week goes, not as a surprise. Queries are about a specific job, raised early. Payroll runs on time. And because pay cost is recorded per job, you can see whether your price work rates still fit what the jobs earn.

The owner gets Friday afternoons back, and the conversation with a gang lead who thinks something is missing becomes a look at one job together rather than an argument about the whole week.

Is price work like this for you?

  • Price work is calculated by hand each week.
  • Gangs dispute their figures regularly.
  • Alterations and extras are argued over.
  • Your rates have not been reviewed for years.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Can it mix price work and day work?

Yes. Each job or part of a job can be paid on either basis.

Can gang leads see their figures during the week?

Yes. A running total is shown on their phone page.

Does it handle splits within a gang?

Yes, using your split rules.

Does it connect to payroll?

Figures can be exported or sent to your payroll package for checking.

Can we review our rates with it?

Yes. Reports show pay cost against job value by work type.

Keep reading

More on Problems We Solve

Start here

Tell us where your scaffolding business leaks time or money

Describe the problem, how your office, yard and gangs handle it now and what software you use. We will tell you what we would build and what we would leave alone, and if a change to your current system would sort it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →