Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. Boards Cut, Fittings Missing, Tubes Bent: How Do We Charge Customers for Damaged Scaffold Kit With Evidence?
Problems We Solve

Boards Cut, Fittings Missing, Tubes Bent: How Do We Charge Customers for Damaged Scaffold Kit With Evidence?

Scaffold boards, tubes and fittings come back damaged or missing after other trades use them. We build strike-day kit checks with photos and charge-backs.

Updated 2 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Damaged and missing scaffold kit is rarely charged because nobody records its condition at handover and strike, so there is no evidence to show the customer. We build strike-day checks on the gang lead's phone that record damaged or missing items with photos against what was delivered, price them from your rates and put them on the customer's invoice for the office to approve.

Boards with saw cuts and a bag of fittings short

The strike goes ahead. The gang finds boards cut to fit around a window, boards covered in render, a few tubes bent where a skip lorry hit the scaffold, and a count of fittings well short of what went out. They load what they have and bring it back.

The yard sorts it. Some boards are scrapped. The fittings are gone. Nobody tells the office in any detail, and even if they did, there are no photos and no record of what went out to that job in the first place.

Why damage is not charged back

Kit is damaged by other trades while the scaffold is standing, and the damage is found at strike, weeks later. Without a record of what was delivered and in what state, a charge is your word against the builder's.

  • What was delivered to the job is not recorded item by item.
  • Damage is found at strike with no photos taken.
  • Missing items are noticed in the yard, not on site.
  • Your terms on damage and loss are not applied consistently.
  • The yard and the office do not talk about it.

What the lost kit costs

Replacing boards, tubes and fittings is a steady drain on a scaffolding business. When it is not charged back, it is simply absorbed. Over time, the stock gets thinner and the yard spends more on replacement. And builders learn that cutting boards costs them nothing.

It also affects the next job. Damaged boards that are not separated out properly in the yard can go back out on the next wagon, where they are either spotted on site and sent back, wasting a trip, or not spotted at all.

The strike-day kit check we build

  1. The loading list for each job records what went out, by item type and quantity.
  2. At handover, the gang lead takes photos of the scaffold, so condition at handover is on record.
  3. At strike, the gang lead records damaged items and missing counts on their phone by item type, with photos of the damage.
  4. Returns are checked in the yard against the loading list, and differences are added to the job.
  5. Damaged and missing items are priced from your damage and loss rates.
  6. The office reviews and approves charges, which are added to the customer's invoice with photos attached.
  7. Reports show damage and loss by customer and site, so you can raise it with repeat offenders.
RecordTaken
What went outLoading list at dispatch
Condition at handoverPhotos at handover
Damage at strikePhotos and counts at strike
What came backYard check against loading list
ChargeYour rates, approved by the office

Whether and how much to charge is your decision under your terms. The record gives you the evidence to do it.

What it changes

Charges for damage and loss are backed by photos and counts, so fewer are disputed. Customers who damage kit find out it costs them, and some change behaviour. The yard knows what to expect back. And you see which sites and customers are expensive to work for.

Does kit come back like this?

  • Boards come back cut or covered in render.
  • Fittings go missing on most jobs.
  • You rarely charge for damage or loss.
  • You have no record of what went out to each job.
  • Builders dispute damage charges.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Do we need to count every fitting?

No. Counts by item type are enough for most firms, with photos for damage.

Can charges go on the same invoice as the hire?

Yes. Approved charges are added to the job's invoice.

What if the customer disputes the charge?

You have the photos and counts to show them. Whether to pursue it is your decision.

Does it help with yard stock?

Yes. Returns checked against loading lists keep your stock figures closer to reality.

Can it work with system scaffold?

Yes. Items are set up by your own types, whatever system you use.

Keep reading

More on Problems We Solve

Start here

Tell us where your scaffolding paperwork gets lost

Describe the problem, who handles it now and what your gangs and office use today, even if that is paper and a phone. We will tell you what we would build and what we would leave alone, and if a smaller change would do the job, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →