Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Can Our QS Team Write Bill of Quantities Descriptions Consistently Without Copying From Old Bills?
Problems We Solve

How Can Our QS Team Write Bill of Quantities Descriptions Consistently Without Copying From Old Bills?

Quantity surveyors copy bill descriptions from old bills, carrying errors forward. We build a description library tied to your measurement rules and specs.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Bill descriptions are copied from old bills, so outdated specification references and wording errors travel from job to job. We build a description library organised by your measurement rules, with approved wording, the specification clauses each item refers to, and checks that flag old references, so surveyors assemble bills from maintained content rather than from the last job.

Writing the bill, one old bill at a time

A surveyor is preparing a bill of quantities for a new school. For each item they need a description that follows the measurement rules, refers to the right specification clause, and reads the same way as the rest of the bill. The quickest way is to open the last school's bill and copy.

So the new bill inherits the old bill's wording, including a reference to a specification clause that was renumbered, a British Standard that has since been superseded, and a description of a fire stopping product the architect no longer specifies. A tenderer queries it. The surveyor finds the same error has been in the practice's bills for years.

Why descriptions drift

  • There is no master set of descriptions, only previous bills.
  • Specification references change with each project's specification, but copied descriptions keep the old ones.
  • Different surveyors word the same item differently, so bills are inconsistent across the practice.
  • Updates to standards and product references are not tracked against descriptions.
  • Nobody owns the wording, so nobody maintains it.

Each individual copy is a reasonable shortcut. Across a practice and many years, the shortcut builds up a lot of quiet error.

What inconsistent descriptions cost

Tender queries you should not have needed to answer. Pricing risk, because a contractor who reads an item differently prices it differently, and the difference surfaces later as a variation. Reviews that take longer because the checker cannot trust any line. And a look of carelessness in a document your client relies on.

IssueWhere it comes fromHow the library helps
Wrong specification clauseCopied from an old jobClause references linked to this project's specification
Superseded standardNobody updated the wordingEntries flagged when a reference is marked as withdrawn
Inconsistent wordingDifferent surveyorsOne approved wording per item
Missing measurement detailRushed copyRequired fields for each item type

The library we build

  1. We gather descriptions from your recent bills and group duplicates and near duplicates by item, with a senior surveyor choosing the approved wording for each.
  2. Descriptions are organised by the measurement rules your practice uses, such as NRM2 work sections, with the required details for each item type.
  3. Each description has placeholders for project-specific details, such as the specification clause, product and size.
  4. For a new project, the specification's clause list is loaded, and placeholders are linked to the right clauses, with anything unmatched flagged.
  5. References to standards and products are tagged, so when someone marks a reference as superseded, every description using it is listed for update.
  6. Surveyors build bills by picking items from the library into your Excel or bill production template, with quantities coming from take-off.
  7. A named person owns the library, and proposed changes from surveyors go to them for approval.

The library holds wording. Which measurement rules apply, and what the specification requires, remain matters for your surveyors and the design team.

Bills after the library

Surveyors spend their time on measurement and on the unusual items, not on retyping standard ones. Bills read consistently across the practice. When a standard or product changes, the library tells you where it appears, and the next bill is right. Tender queries are more likely to be about the design than about your wording.

Training changes as well. A new surveyor learns the practice's way of describing work from a maintained library with notes, rather than from whichever old bill they happened to be given, which means their first bills need less correction.

Does this sound like your bills?

  • Bill descriptions are copied from the last similar project.
  • Tenderers have queried out-of-date clause or standard references.
  • Two surveyors describe the same item in different ways.
  • Nobody maintains a master set of descriptions.
  • Checking a bill means reading every line with suspicion.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Do we need a particular bill production software?

No. The library can output into Excel or into a bill production tool that accepts imports.

Will it keep track of standards for us?

It tracks where references are used. Someone in your practice decides when a reference is out of date and marks it.

How do we build the first version?

From your existing bills. We group and suggest, and your senior surveyors choose the approved wording.

What affects the cost?

The number of past bills to process, the work sections you cover, and the output formats you need.

Keep reading

More on Problems We Solve

Start here

Tell us where the paperwork slows your surveyors

Describe the documents your surveyors produce, the tools they use and where the time goes. We will tell you what we would build and what we would leave alone, and if a smaller change would fix it, we will say so. Professional judgement stays with your surveyors.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →