Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Stop Printing From the Wrong Proof Because the Approval Was Buried in an Email?
Problems We Solve

How Do We Stop Printing From the Wrong Proof Because the Approval Was Buried in an Email?

Print proof approvals get buried in email and the wrong version reaches press. We build a proof approval system that records exactly what was signed off.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

The wrong proof reaches the press when approvals arrive as email replies that do not say which version they refer to. We build proof approval into the job: every proof is versioned, the customer approves or annotates a specific version online, and the job cannot move to plating or the digital queue until that version is recorded as approved.

The reply that said 'looks good'

The customer asked for three changes to the leaflet. Your studio made them and sent proof 3. The customer replied 'looks good, go ahead' to the thread, but the reply was attached to proof 2's email. Someone in production saw the approval, pulled the latest file they could find, which was in fact proof 2 with one correction missing, and it printed.

Five thousand leaflets later, the phone rings. Who pays for the reprint depends on an email trail that three people now have to read carefully, and nobody enjoys the conversation.

Where proofing goes wrong

Proofing is a version control problem that most printers run through email. Email is good at conversation and bad at saying exactly which file a comment belongs to.

  • Proofs are sent as attachments, so several versions exist in several inboxes.
  • Approval arrives as free text, sometimes with further changes buried in it.
  • Production decides which file is final by looking at file names and dates.
  • Nothing stops a job moving to plates or the digital queue without an approval on record.
  • When a dispute happens, the evidence is spread across personal inboxes.

What the loose approvals cost

Reprints are the visible cost: stock, press time and finishing done twice, and often absorbed by you because the paper trail was unclear. The quieter cost is the time spent chasing approvals that never arrive, because nobody owns the follow-up, and the press slot that sits empty while a customer is on holiday. Account handlers also spend a surprising part of their day forwarding proofs and asking whether 'fine' means approved.

Proof approval built into the job

  1. Each proof is uploaded against the job number and given a version automatically. Old versions stay visible but are marked as superseded.
  2. The customer receives a link, not an attachment. They view the proof, add comments pinned to the page, and choose approve or request changes.
  3. Approval is recorded with the version, the person, the time and any comments, and the customer receives a copy for their records.
  4. Reminders go to customers who have not responded, on a schedule you set, and the account handler sees who is overdue.
  5. The job status in your MIS updates when the proof is approved, and production only sees the approved file.
  6. Plating or digital release is blocked until an approved version exists, unless a named person overrides with a reason.
QuestionAnswered by email trailAnswered by the system
Which version was approved?Read the thread carefullyShown on the job
Who approved it?Whoever repliedNamed person and time
Were changes requested too?Buried in the textSeparate comments on the page
Is anything waiting on the customer?Ask aroundOverdue list

Life with clean approvals

Production works from one file per job, the approved one. Account handlers stop forwarding PDFs. When a customer disputes a finished job, the approval record answers it in a minute. Customers generally like it too, because commenting on the page is easier than describing a change in an email.

It also changes how proof chasing works. Instead of an account handler remembering to ring about the brochure proof on Friday, the overdue list shows every proof waiting on a customer, how long it has waited and which press slot depends on it. You decide which ones to chase, and the reminders handle the rest.

Does your proofing look like this?

  • You have printed from the wrong version at least once.
  • Approvals come in as 'ok' replies without a version.
  • Jobs sit waiting for approvals that nobody is chasing.
  • Disputes involve forwarding old emails to your manager.
  • Your studio and production keep separate folders of 'final' files.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Will customers accept approving online instead of by email?

Most do, because it is a link and a button. For customers who insist on email, their approval can be attached to the right version by your account handler so the record stays complete.

Does this replace our MIS?

No. The approval system updates the job in your MIS, or in whatever you use to track jobs, rather than becoming another place to look.

Can it handle hard copy proofs as well?

Yes. A hard copy proof can be logged against a version, and the customer's signed sheet scanned and attached.

Who can override the block on unapproved jobs?

Whoever you decide. The override needs a reason and is recorded, so rush jobs still move but the decision is visible.

What does it cost to build?

That depends mainly on how many systems it connects to and how your studio currently stores proofs. We scope it after looking at your current flow.

Keep reading

More on Problems We Solve

Start here

Tell us where the print office loses the day

Describe your presses, your finishing, what your MIS does today and where the paperwork piles up. We will tell you what we would build and what we would leave alone, and if a setting in your existing MIS would fix it, we will say so.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →