Think Build Implement Repeat
London, UK +44 7367 067226
WhatsApp FOLLOW f in X
  1. Home
  2. Blog
  3. How Do We Get Press Releases Signed Off by Everyone on the Client Side Without Chasing for Days?
Problems We Solve

How Do We Get Press Releases Signed Off by Everyone on the Client Side Without Chasing for Days?

PR agency press releases stall in client approval chains, with versions lost in email. We build a sign-off route showing who holds it and what changed.

Updated 3 min readBy SpiderHunts Technologies

Free estimateNo obligation

Get a free estimate

Tell us what you need. A senior engineer reads every enquiry.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →

Quick answer — TL;DR

Releases stall because approval runs through email to several people on the client side, each with their own version, and nobody can see who is holding it. We build an approval route per client that sends the current version to each approver in order or in parallel, records comments and sign-off, and shows the account team where it is stuck.

Version 7 FINAL (2) CEO comments

The release was drafted on Monday. The client's marketing manager made changes on Tuesday. The product lead added a technical paragraph. The CEO wants his quote to sound less formal. Legal needs to see anything that mentions a partner company, and the partner company needs to approve their own quote. Each of them received a Word attachment, each edited a different version, and two of them replied to an older email thread.

By Thursday the account manager is merging tracked changes from four documents, not sure whether legal has seen the latest wording, and the launch is on Monday. She sends a chasing email to the whole chain, which prompts the marketing manager to make fresh changes to a paragraph legal already approved.

Why approval chains break

The people approving a release are busy and it is not their main job. The process makes it harder than it needs to be.

  • Attachments by email mean every approver can edit a different copy.
  • The order of approval is unwritten, so people approve too early or too late.
  • Nobody can see who is holding the release right now.
  • Changes after sign-off are not flagged, so earlier approvers do not see them.
  • Partner and third-party quotes need their own sign-off that sits outside the client's own chain.

The cost of a slow sign-off

Stalled releases miss news moments and embargo slots booked with journalists. Last-minute changes introduce errors, like a quote approved in one form and published in another. Account managers spend hours chasing rather than selling in. And when something goes wrong, nobody can show who approved which wording.

How we build the approval route

  1. Each client has a route template: who approves releases, in what order, and which approvers are only needed for certain topics, such as legal for partner mentions.
  2. The release sits in one place, a Microsoft 365 or Google document, or our own editor, so there is only ever one current version.
  3. Each approver gets a link to the current version with a clear ask: approve, approve with comments, or request changes. No attachments.
  4. Parallel steps run together where order does not matter, so the product lead and legal can review at the same time.
  5. If text changes after someone has approved, they are told which part changed and asked to reconfirm only that part.
  6. Partner quotes go to the partner contact as a separate small approval, showing only their quote and its context.
  7. A board for the account team shows every release in progress, who is holding it and for how long, with gentle automatic reminders at intervals you set.
ApproverSeesStep
Marketing managerFull releaseFirst, sequential
Product leadFull releaseParallel with legal
LegalFull release, partner mentions highlightedParallel, only when partners are named
Partner contactTheir quote in contextSeparate approval
CEOFinal version with change summaryLast

Every approval is recorded with the exact text approved and the time, which gives the agency a clear record if a question comes up later.

Sign-off, the following week

The account manager uploads the draft and starts the route. Marketing approves on Tuesday with two comments. Product and legal review in parallel on Wednesday. The partner confirms their quote from a link. The CEO gets the final version with a one-page summary of what changed and approves on Thursday morning. When the marketing manager tries a late edit to an approved paragraph, legal is automatically asked to reconfirm that paragraph only.

The board shows the release moving the whole time, and the account manager spends Thursday selling in.

Check your own process

  • Releases go to approvers as Word attachments.
  • You merge tracked changes from several copies.
  • Nobody knows who is holding a release until you chase.
  • Approved text sometimes changes without earlier approvers knowing.
  • Partner quotes are approved in a separate email thread.

FAQ

Frequently asked questions

The questions readers ask us after this guide.

Still have a question?

Ask us directly — a senior engineer will get back to you.

Ask about your project

Will client approvers need a new login?

Usually not. They receive a secure link. If your client prefers to approve inside their own Microsoft 365, we can work with that.

Can approvers still use tracked changes?

Yes, if the release lives in a Word or Google document. The route controls who sees it and when, not how they edit.

What if a client refuses to use it?

The account manager can record approvals received by email against the route, so the record stays complete even for reluctant approvers.

Do we need a route for every client?

Only for clients with more than one or two approvers. Simple clients can use a default route.

Keep reading

More on Problems We Solve

Start here

Tell us where releases and coverage slow your PR team down

Describe how a release moves from first draft to sign-off at your agency, who has to approve it on the client side, and how you check what coverage actually said. We will tell you what we would build and what would be overkill, and if a change to your current process would do the job without software, we will say that instead.

  1. You tell us what you needTwo minutes on the form, or a message on WhatsApp.
  2. A senior engineer reviews itAnd comes back with questions, a realistic range and an honest view on fit.
  3. Free 30-minute scoping callWe talk through scope, options and a realistic estimate — with no obligation.
Free estimateNo obligation

Talk to someone who builds this

Send a short brief and we will come back with an honest view and a realistic range.

Takes under a minute. We never share your details.

  • Free consultation
  • No commitment
  • NDA on request

Prefer to talk? Book a free 30-minute call →